MEC01-02097
| Final | 9/11/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/11/2001 at 14:40:47. Contact: ###-####. c/n complete elec connections, registers, p&t valve piping, etc 9/12/2001 11:19:48 AM
|
BLD01-01920
| BLD-Footing | 9/11/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | A | PART |
|
|
###-####
|
BLD00-01244
| BLD-Final | 9/10/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 09:28:11. Contact: ###-####. c/n, need verification of hvac ventilation per plans & UBC ch.12; obain elec final. 9/12/2001 11:39:08 AM
|
MEC01-02593
| Rough-in | 9/11/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | A | PART |
|
|
###-####call first furn/wh vents & pt...complete plenums, ok to continue. venting ok per 411? 9/12/2001 10:56:37 AM
|
BLD01-00673
| BLD-Final | 9/11/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/11/2001 at 12:34:30. Contact: ###-####. c/n rails, no plans 9/12/2001 11:26:35 AM
|
BLD01-01743
| BLD-Framing/Rough-in | 9/11/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/11/2001 at 14:06:06. Contact: ###-####.c/n need hd's,straps installed eng'r to report on truss brg & "fix",& anchor bolts at shearw alls at existing. ok to insul.
, 9/12/2001 11:05:41 AM
|
BLD01-01556
| BLD-Framing/Rough-in | 9/12/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | P | PART |
|
|
fire walls dave ###-#### shaft thru 2nd fl ok per detail. 9/12/2001 3:52:28 PM ok to cover vert & horiz. portion of shaft 9/12/2001 3:53:11 PM
|
BLD01-01642
| BLD-Framing/Rough-in | 9/12/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | P | PART |
|
|
dry wall insp for fire wall ###-####- tim ok to complete 1hr drywall..at lid; verify east 1hr wall. (existing w parapet added.) 9/12/2001 4:50:59 PM
|
BLD01-01867
| BLD-Framing/Rough-in | 9/12/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | P | PART |
|
|
Don, ###-#### walls ok, pend plbg. 9/12/2001 4:23:14 PM
|
BLD01-00512
| BLD-Conference | 9/12/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/12/2001 at 11:03:47. Contact: ###-####....w/ Jason, need drawings 9/12/2001 1:55:00 PM, verify req'd firerating at cols...main or secondary? 9/12/2001 2:39:35 PM
|
BLD01-02431
| BLD-Conference | 9/12/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | P | PASS |
|
|
###-#### reshear wall req's 2320 ubc. need detail for modifications. 9/12/2001 3:06:23 PM
|
BLD01-00234
| BLD-Framing/Rough-in | 9/12/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 9/12/2001 1:53:39 PM soiled linen rm 1st fl, int penetrations ok...need chk dampers.
|
BLD98-03705
| BLD-Conference | 9/12/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 9/12/2001 3:51:50 PM w/ supt re insp process...still need all other hvac, elec, plbg, & finish plans
|