Inspections for the day of: Wednesday, September 12, 2001.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-02295 Rough-in9/11/20019/12/20019/12/2001 12:00:00 AMAPASS
no f/ps 9/12/2001 10:55:21 AM
MEC01-02704 Pressure Test9/11/20019/12/20019/12/2001 12:00:00 AMAPASS
2 of 2 test ok 9/12/2001 10:09:13 AM
MEC01-02611 Final9/12/20019/12/20019/12/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/12/2001 at 01:34:52. Contact: ###-####.
MEC01-02611 Pressure Test9/12/20019/12/20019/12/2001 12:00:00 AMAPASS
Added by Inspector: 350 On 9/12/2001 10:39:29 AM
MEC01-01479 Rough-in9/12/20019/12/20019/12/2001 12:00:00 AMPPART
need to break this permit up into 3 seperate for three different occupancies 9/12/2001 2:34:35 PM
MEC01-02730 Pressure Test9/12/20019/12/20019/12/2001 12:00:00 AMPPASS
###-####
MEC01-02730 Final9/12/20019/12/20019/12/2001 12:00:00 AMPPASS
MEC01-02363 Rough-in9/12/20019/12/20019/12/2001 12:00:00 AMPPART
Added by Inspector: 350 On 9/12/2001 3:51:05 PM duct ok, no grid or grease hoods yet
MEC01-02649 Final9/12/20019/12/20019/12/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/12/2001 at 08:11:24. Contact: ###-####.
MEC01-02720 Rough-in9/12/20019/12/20019/12/2001 12:00:00 AMPFAIL
c/n posted 9/12/2001 2:57:40 PM
MEC01-02363 Conference9/12/20019/12/20019/12/2001 12:00:00 AMPPASS
for conf-- rob ###-####
MEC01-02444 Pressure Test9/11/20019/12/20019/12/2001 12:00:00 AMPPASS
###-####