BLD00-01243
| BLD-Final | 9/10/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 09:29:01. Contact: ###-####.
|
BLD01-01722
| BLD-Framing/Rough-in | 9/11/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | A | PASS |
|
|
fr doug ###-####
|
BLD01-01337
| BLD-Framing/Rough-in | 9/11/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | A | FAIL |
|
|
###-####
|
BLD00-03629
| BLD-Final | 9/11/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/11/2001 at 17:12:24. Contact: ###-####.c/n posted . 9/12/2001 12:21:20 PM
|
BLD00-02820
| BLD-Energy code compliance | 9/12/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | P | PART |
|
|
john ###-#### need top of a chase at 2 nd level completed. 9/13/2001 8:58:52 AM
|
BLD01-01784
| BLD-Footing | 9/12/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | P | CANC |
|
|
###-####
|
BLD01-01180
| BLD-Energy code compliance | 9/12/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | P | FAIL |
|
|
###-####\\###-#### c/n posted. 9/12/2001 3:53:05 PM
|
BLD01-01739
| BLD-Final | 9/11/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | P | FAIL |
|
|
###-####gary. need ele finaled, need inside of garage for inspection ,needs grade, c/n posted inspection incomplete. 9/12/2001 1:44:14 PM
|
BLD00-02809
| BLD-Framing/Rough-in | 9/12/2001 | 9/12/2001 | 9/12/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 407 On 12/9/2001 1:53:41 PM ok to rock left side of building, except for the garage .needs ele insp.
|