Inspections for the day of: Thursday, September 12, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-02117 BLD-Final9/11/20029/12/20029/12/2002 12:00:00 AMAPASS
Demo ###-####
BLD02-01729 BLD-Final9/11/20029/12/20029/12/2002 12:00:00 AMAFAIL
1. WOOD/EARTH SEPARATION - Wood used in construction of permanent structures and located nearer than 6 inches to earth shall be treated wood or wood of natural resistance to decay. Where located on concrete slabs placed on earth, wood shall be treated wood or wood of natural resistance to decay. (1997 UBC 2306.8)
MIS02-00186 BLD-Final9/11/20029/12/20029/12/2002 12:00:00 AMAPART
pauline ###-#### pauline ###-#### blk and tie down ok. 9/12/2002 10:30:49 AM
MIS02-00215 BLD-Final9/11/20029/12/20029/12/2002 12:00:00 AMAPART
pauline ###-#### blk and tie down ok 9/12/2002 10:30:35 AM
MEC02-02514 Pressure Test9/11/20029/12/20029/12/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/11/2002 at 15:09:44. Contact: ###-####.
MEC02-02514 Rough-in9/11/20029/12/20029/12/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/11/2002 at 15:09:57. Contact: ###-####.
BLD02-01614 BLD-Final9/12/20029/12/20029/12/2002 12:00:00 AMPPART
###-#### ###-####all but exterior work complet temp occ ok. 9/12/2002 3:31:14 PM
BLD02-00828 BLD-Final9/12/20029/12/20029/12/2002 12:00:00 AMPFAIL
###-#### ###-#### need single function egress hardware and fire sprinkler walk through/ not sign off as insp by plan review but apears to be over spacing in some areas. 9/12/2002 1:26:50 PM
BLD02-01938 BLD-Footing9/9/20029/12/20029/12/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/09/2002 at 12:37:25. Contact: ###-####.
BLD02-01486 BLD-Final9/11/20029/12/20029/12/2002 12:00:00 AMPPASS
###-####