Inspections for the day of: Thursday, September 12, 2002.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01874 BLD-Final9/11/20029/12/20029/12/2002 12:00:00 AMAFAIL
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung, need fire ok... 9/12/2002 1:27:44 PM
BLD02-01782 BLD-Framing/Rough-in9/11/20029/12/20029/12/2002 12:00:00 AMAPART
DAVE ###-####, walls ok 9/12/2002 1:39:34 PM spec insp report pending. 9/12/2002 1:40:14 PM
BLD02-01783 BLD-Framing/Rough-in9/11/20029/12/20029/12/2002 12:00:00 AMAPART
DAVE ###-#### walls ok 9/12/2002 1:41:31 PM
BLD02-01784 BLD-Framing/Rough-in9/11/20029/12/20029/12/2002 12:00:00 AMAPART
DAVE -###-#### walls ok 9/12/2002 1:41:39 PM
BLD01-01469 BLD-Final9/12/20029/12/20029/12/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 09/12/2002 at 09:08:31. Contact: ###-####....need spec insp summary report, eng's ok,..other signature's 9/12/2002 1:26:51 PM
BLD02-00276 BLD-Conference9/12/20029/12/20029/12/2002 12:00:00 AMPPART
w/ fire insp....need final?
BLD02-01883 BLD-Conference9/12/20029/12/20029/12/2002 12:00:00 AMPPASS
ok to 1 side walls
BLD02-01352 BLD-Conference9/10/20029/12/20029/12/2002 12:00:00 AMPNH
BLD02-01352 BLD-Conference9/10/20029/12/20029/12/2002 12:00:00 AMPNH
BLD02-00276 BLD-Conference9/10/20029/12/20029/12/2002 12:00:00 AMPNH
BLD02-00276 BLD-Conference9/10/20029/12/20029/12/2002 12:00:00 AMPNH