PLM03-01999
| PLM-Aging Inspection | 9/12/2003 | 9/12/2003 | 9/12/2003 12:00:00 AM | | PASS |
|
|
stillworking on project 9/12/2003 8:31:52 AM
|
PLM03-02840
| Water and/or Sewer | 9/11/2003 | 9/12/2003 | 9/12/2003 12:00:00 AM | A | PASS |
|
|
eddie; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
PLM03-01921
| Plumbing Rough-in | 9/12/2003 | 9/12/2003 | 9/12/2003 12:00:00 AM | A | PASS |
|
|
|
PLM03-02852
| Water and/or Sewer | 9/11/2003 | 9/12/2003 | 9/12/2003 12:00:00 AM | P | PASS |
|
|
###-#### michael
|
PLM03-01999
| Final | 9/12/2003 | 9/12/2003 | 9/12/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 9/12/2003 at 7:43:20 AM. Contact: ###-####.
|
PLM03-01679
| Final | 9/12/2003 | 9/12/2003 | 9/12/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 9/12/2003 at 8:20:41 AM. Contact: ###-####. need to have premise protection tested and ceritified caulk all mop sink,s to wall and floor lower floor cleanout,s flush with floor ( two locations ) left correction notice with general on job site 9/12/2003 2:37:52 PM
|