ELE03-02835
| Rough-In Permanent Service | 9/11/2003 | 9/12/2003 | 9/12/2003 12:00:00 AM | A | PASS |
|
|
alan; Phone #: ###-#### Internet Inspection Request from: Marc Lileks ok cover ri p/s u/g n ok survey wall spacing up stairs 9/12/2003 9:54:43 AM
|
ELE03-02355
| Final | 9/11/2003 | 9/12/2003 | 9/12/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 9/11/2003 at 2:59:37 PM. ok final 9/12/2003 8:32:12 AM
|
ELE03-01879
| Final | 9/11/2003 | 9/12/2003 | 9/12/2003 12:00:00 AM | A | NH |
|
|
Phone #: ###-#### Internet Inspection Request from: Justin Yount no access called left message 9/12/2003 9:53:41 AM
|
ELE03-02453
| Final | 9/12/2003 | 9/12/2003 | 9/12/2003 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 9/12/2003 at 8:59:25 AM. Contact: ###-####. they added cubicals & they were not completed 9/12/2003 3:18:55 PM
|
ELE03-02752
| Final | 9/12/2003 | 9/12/2003 | 9/12/2003 12:00:00 AM | P | PASS |
|
|
alan; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok final 9/12/2003 3:40:17 PM
|
ELE03-02754
| Electrical Rough-In | 9/12/2003 | 9/12/2003 | 9/12/2003 12:00:00 AM | P | PASS |
|
|
mark under ground; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok cover underground conduit 9/12/2003 4:57:52 PM
|
ELE03-02214
| Electrical Rough-In | 9/12/2003 | 9/12/2003 | 9/12/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 9/12/2003 at 10:35:39 AM. Contact: ###-####. ok cover part 2nd floor pan deck concrete 9/12/2003 4:58:38 PM
|
ELE03-00666
| Final | 9/12/2003 | 9/12/2003 | 9/12/2003 12:00:00 AM | P | FAIL |
|
|
corrections NEC110.3(A)(7),110.26(A),210.70(A)(3),410.8(A),210.52(C)(5)exception,BCC all equipment shall be connected (h2o recirc. pump) note nec210.8(a)(4)
|