Inspections for the day of: Monday, September 12, 2005.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE05-03051 Final9/12/20059/12/20059/12/2005 4:19:58 PMPPASS
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to final
ELE05-03313 Electrical Rough-In9/12/20059/12/20059/12/2005 4:19:10 PMPCANC
###-#### - ron see rip
ELE05-03278 Temporary Service9/12/20059/12/20059/12/2005 2:44:01 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Celinda Winters t/s u/g re-use existing temp pole, ok
ELE05-03311 Electrical Rough-In9/12/20059/12/20059/12/2005 2:24:20 PMPPASS
###-#### - dan met with contr, went over no staple nm on edge, add recpt in exst dr, ric ok, sub-panel ok
ELE05-03310 Electrical Rough-In9/12/20059/12/20059/12/2005 2:22:06 PMPPASS
###-#### - ron ric ok
ELE05-03137 Electrical Rough-In9/12/20059/12/20059/12/2005 1:46:55 PMPCANC
kevin; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles see rip
ELE05-03291 Rough-In Permanent Service9/9/20059/12/20059/12/2005 10:12:24 AMAPASS
charlie-- ###-#### ric ok, p/s u/g n ok
ELE05-01631 Temporary Service9/10/20059/12/20059/12/2005 9:52:21 AMACANC
Scheduled by a contractor via Hello! on 9/10/2005 at 11:30:18 AM. Contact: ###-####. see ri
ELE05-03305 Electrical Rough-In9/9/20059/12/20059/12/2005 9:42:48 AMAPASS
###-#### - allen ric ok, check room count at final
ELE05-03304 Rough-In Permanent Service9/9/20059/12/20059/12/2005 8:28:57 AMAPASS
ray ###-#### ric ok p/s u/g n ok
ELE05-03301 Temporary Service9/9/20059/12/20059/12/2005 8:18:11 AMAPASS
###-#### - rowdy called contr, re-connect pole from neighbor job, t/s u/g n ok
ELE05-01631 Electrical Rough-In9/12/20059/12/20059/12/2005 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 9/10/2005 at 11:30:18 AM. Contact: ###-####. talked w/ contr, looked at u/g for construction elevator, partial gndg for switchgear, they are just starting to pull some wiring, looked at temp power dist center that they can hoist up as floor gets poured. Talked about a print to mark as inspections are done.
ELE05-03313 Rough-In Permanent Service9/12/20059/12/20059/12/2005 12:00:00 AMPPASS
###-#### - ron had contr add 1 recpt. ric ok, p/s u/g n pk
ELE05-03137 Rough-In Permanent Service9/12/20059/12/20059/12/2005 12:00:00 AMPPASS
kevin; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles called contr to gnd metal box in up bath over mirror and change 2 gang box by garage entry. ric ok, p/s u/g n ok