FIR05-00403
| INSP-Sprinkler Rough-in/Hydro | 9/11/2006 | 9/12/2006 | 9/12/2006 5:06:21 PM | P | PART |
|
|
OH hydrostatic test passed inspection.
|
FIR06-00376
| INSP-Sprinkler Rough-in/Hydro | 9/8/2006 | 9/12/2006 | 9/12/2006 2:52:27 PM | A | DEFR |
|
|
Inspection request was intended for the fire sprinkler permit portion of this project, not fire alarm at this time.
|
FIR06-00346
| INSP-Sprinkler Rough-in/Hydro | 9/11/2006 | 9/12/2006 | 9/12/2006 2:51:24 PM | A | PART |
|
|
Re-test of hydrostatic for the underfloor system passed.
|
BLD05-02221
| FIRE-Final Inspection | 9/11/2006 | 9/12/2006 | 9/12/2006 9:55:35 AM | A | PASS |
|
|
Life safety passed.
|
FIR06-00407
| INSP-Final Inspection | 9/11/2006 | 9/12/2006 | 9/12/2006 9:28:07 AM | A | PART |
|
|
Rough-in corrections have been completed, OH is okay for cover at the drop ceiling areas.
|
FIR06-00381
| INSP-Final Inspection | 9/8/2006 | 9/12/2006 | 9/11/2006 1:44:51 PM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 9/8/2006 at 8:02:50 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Sep 11 2006 1:44PM.
|