FIR06-00515
| INSP-Sprinkler Rough-in | 9/12/2006 | 9/12/2006 | 9/12/2006 4:46:19 PM | P | PASS |
|
|
Underground piping is ok to cover
|
FIR06-00168
| INSP-Sprinkler Rough-in/Hydro | 9/12/2006 | 9/12/2006 | 9/12/2006 4:45:08 PM | P | PASS |
|
|
Underground hydro test passed
|
FIR05-00536
| INSP-Sprinkler Rough-in/Hydro | 9/12/2006 | 9/12/2006 | 9/12/2006 2:38:38 PM | P | PART |
|
|
Rough in Inspection for the remaining areas of the 4th floor new tower is passed except for there are numerous areas where the hangers and piping have been removed by other contractors. Prior to final rough-in being passed another inspection will be required to verify everything has been corrected.
|
BLD05-01394
| FIRE-Final Inspection | 9/11/2006 | 9/12/2006 | 9/12/2006 1:36:15 PM | A | CANC |
|
|
randy says he is still missing the door hardware. No inspection performed.
|
FIR06-00255
| INSP-Final Inspection | 9/11/2006 | 9/12/2006 | 9/12/2006 1:07:29 PM | A | PASS |
|
|
Above ground hydro test passed.
|