FIR07-00695
| INSP-Sprinkler Rough-in/Hydro | 9/11/2007 | 9/12/2007 | 9/14/2007 10:33:09 AM | A | DEFR |
|
|
Scheduled for 9/13.
|
FIR07-00235
| INSP-Sprinkler Rough-in/Hydro | 9/10/2007 | 9/12/2007 | 9/13/2007 1:34:00 PM | A | FAIL |
|
|
Hydrostatic test failed due to pressures below 200psi at the guage.
|
FIR07-00236
| INSP-Sprinkler Rough-in/Hydro | 9/10/2007 | 9/12/2007 | 9/13/2007 1:32:59 PM | A | FAIL |
|
|
Hydrostatic testing failed due to pressures below 200psi at the guage.
|
FIR07-00250
| FIR-Aging Inspection | 9/12/2007 | 9/12/2007 | 9/12/2007 3:30:24 PM | | DEFR |
|
|
Work in progress, not completed for final inspection at this time per last site visit.
|
FIR07-00685
| INSP-Sprinkler Rough-in/Hydro | 9/11/2007 | 9/12/2007 | 9/12/2007 3:27:14 PM | A | PART |
|
|
Red lines on approved plans indicate rooms and areas okay for drop ceiling cover.
|
BLD07-00625
| FIRE-Conference | 9/12/2007 | 9/12/2007 | 9/12/2007 3:01:32 PM | P | CANC |
|
|
Overbooked.
|
FIR07-00106
| INSP-Final Inspection | 9/10/2007 | 9/12/2007 | 9/12/2007 3:00:56 PM | P | CANC |
|
|
Overbooked.
|
FIR07-00617
| INSP-Final Inspection | 9/11/2007 | 9/12/2007 | 9/12/2007 3:00:26 PM | P | CANC |
|
|
Overbooked.
|
FIR07-00619
| INSP-Sprinkler Rough-in | 9/12/2007 | 9/12/2007 | 9/12/2007 2:59:42 PM | P | CANC |
|
|
Wrong permit called in for inspection, was intended for an UG permit.
|
BLD07-00376
| FIRE-Final Inspection | 9/11/2007 | 9/12/2007 | 9/12/2007 2:58:10 PM | A | PASS |
|
|
Life safety inspection passed.
|
FIR07-00762
| INSP-Sprinkler Rough-in | 9/11/2007 | 9/12/2007 | 9/12/2007 2:57:09 PM | A | PART |
|
|
Overhead fire sprinkler TI modifications are approved for cover, noted one closet has been deleted and no longer in need of coverage.
|
FIR07-00544
| INSP-Sprinkler Rough-in | 9/11/2007 | 9/12/2007 | 9/12/2007 2:54:01 PM | A | PART |
|
|
OH rough-in and existing fire sprinkler system modifications completed acceptable, final pending field ceiling tile install.
|
BLD06-03088
| FIRE-Conference | 9/11/2007 | 9/12/2007 | 9/12/2007 2:51:09 PM | A | DONE |
|
|
On site conference regarding first floor life safety including fire alarm and sprinkler work for the first floor office area only.
|
FIR07-00620
| INSP-Sprinkler Rough-in | 9/11/2007 | 9/12/2007 | 9/12/2007 1:31:40 PM | A | PART |
|
|
See approved plans for areas okay for cover at the hard lid ceilings.
|
FIR07-00681
| INSP-Sprinkler Rough-in | 9/11/2007 | 9/12/2007 | 9/12/2007 12:07:36 PM | A | PART |
|
|
OH install is approved for cover as noted on approved plan set.
|
FIR07-00693
| INSP-Alarm Testing | 9/6/2007 | 9/12/2007 | 9/12/2007 11:58:47 AM | A | PART |
|
|
Fire alarm work passed inspection, noted deleted SD's for door release, field modifications due to equipment layout are acceptable, final pending record of completion forms and verification that new tools will not obstruct coverage.
|
FIR07-00441
| INSP-Alarm Testing | 9/11/2007 | 9/12/2007 | 9/11/2007 3:59:29 PM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 9/11/2007 at 7:10:04 AM. Contact: ###-####. Inspection cancelled from web by: Patricia Smith
|