Inspections for the day of: Wednesday, September 12, 2007.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00813 INSP-Alarm Testing9/12/20079/12/20079/13/2007 7:39:48 AMPDONE
The fire alarm panel manufacturer, phone lines and supervision of NAC 4 and NAC 5 were verified. The smoke detector in the facp room and down the corridor as marked on the plans were tested. I found that the smoke detector and audio/visual were both overspaced from the end of the corridor. Also a NAC panel has been added in the facp room. Plans need to be resubmitted showing the new NAC. The facp was in trouble due to missing monitor modules at the roof top units. I went over requirements with the owner, building contractor, electrical contractor and fire alarm contractor.
BLD07-01530 FIRE-Final Inspection9/12/20079/12/20079/13/2007 7:34:56 AMPPASS
Life safety passed.
FIR07-00602 INSP-Sprinkler Rough-in9/12/20079/12/20079/13/2007 7:34:15 AMPCANC
The second floor piping can be covered. A sprinkler head needs to be added in the small triangular closet in the reception area.
FIR07-00534 INSP-Final Inspection9/11/20079/12/20079/12/2007 3:22:08 PMPCANC
Please call 1/2 hour prior to inspection. Brian is the contact, thank you. Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
FIR06-00988 INSP-Sprinkler Rough-in/Hydro9/12/20079/12/20079/12/2007 2:44:32 PMPPASS
The underground hydro test passed for both lines.
BLD05-00633 FIRE-Final Inspection9/12/20079/12/20079/12/2007 2:36:30 PMPCANC
I spoke to wayne by phone and told him that I would not do the life safety inspection until the fire alrm and sprinklers were complete.
BLD07-01704 FIRE-Conference9/11/20079/12/20079/12/2007 2:32:20 PMAFAIL
Drove to the job site but contractor was not there. I left a message on his phone.
FIR07-00610 INSP-Final Inspection9/12/20079/12/20079/12/2007 12:01:47 PMAPASS
permit finaled
FIR07-00678 INSP-Final Inspection9/11/20079/12/20079/12/2007 11:43:06 AMAPASS
Permit finaled
FIR07-00696 INSP-Sprinkler Rough-in9/11/20079/12/20079/12/2007 11:13:06 AMAPASS
Sprinkler piping is ok to cover. One additional hanger is required in the backroom.
FIR07-00756 INSP-Sprinkler Rough-in9/11/20079/12/20079/12/2007 10:58:12 AMAPART
The 5'-0" stub out is ok to cover. As measured it does not have the 4'-6" required bury. The top of pipe is 6'-2" from the top of the foundation. The general contractor assured me that once the finish grade and landscaping is complete the piping would have the required 4'-6" bury. If it does I notified him it would need to be dug up and installed at the correct depth.
FIR07-00642 INSP-Sprinkler Rough-in9/11/20079/12/20079/12/2007 10:55:37 AMAPASS
See the city approved plans for piping in the womens clothing area that is ok to cover.
FIR07-00758 INSP-Sprinkler Rough-in/Hydro9/11/20079/12/20079/12/2007 10:54:34 AMAPART
The mens restroom sprinkler piping is ok to cover. The womens area is not done yet. Sprinkler penndants are overspaced in the coffee shop area.