Inspections for the day of: Friday, September 12, 2008.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorPat Lass
TitleELE-INSPECTOR
Phone #794-9478
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE07-01181 ELE-Aging Inspection9/12/20089/12/20089/16/2008 3:26:22 PM PASS
ELE07-01243 ELE-Aging Inspection9/12/20089/12/20089/16/2008 3:07:21 PM PASS
ELE07-01118 ELE-Aging Inspection9/12/20089/12/20089/15/2008 4:07:04 PM PASS
ELE08-02512 Conference9/11/20089/12/20089/12/2008 4:17:16 PMPPASS
John-Please call to arrange time Phone #: ###-####
talked about bathroom requirements
ELE08-02237 Final9/12/20089/12/20089/12/2008 3:48:45 PMPPASS
Scheduled by a contractor via Hello! on 9/12/2008 at 10:58:31 AM. Contact: ###-####. call for access
ELE08-02507 Electrical Rough-In9/11/20089/12/20089/12/2008 3:06:31 PMPNR
Phone #: ###-#### Internet Inspection Request from: Mark Hennequin
bathroom not done and plastic boxes in kitchen are mounted with internal screws.
no esc in project
ESC08-00347 General Inspection9/12/20089/12/20089/12/2008 2:43:01 PMPPASS
ok
ELE08-01968 Final9/11/20089/12/20089/12/2008 2:42:29 PMPNR
Contact Eric Stewart Phone #: ###-#### Internet Inspection Request from: Shelli Daylong
requires disconnects and electrodes for press box and dug-outs
ELE08-02505 Final9/11/20089/12/20089/12/2008 1:42:45 PMPNR
Please call James Sanderson at ###-#### w/ 1/2hr notice for access. Thanks, Andrea. Phone #: ###-#### Internet Inspection Request from: Andrea Creek
had conf about new requirements.
ESC08-00610 General Inspection9/12/20089/12/20089/12/2008 11:48:44 AMAPASS
looks good
ELE08-02061 Final9/11/20089/12/20089/12/2008 11:47:47 AMAPASS
Scheduled by a contractor via Hello! on 9/11/2008 at 9:10:19 PM. Contact: ###-####.
ELE08-02446 Final9/11/20089/12/20089/12/2008 10:30:24 AMAFAIL
JESSIE Phone #: ###-####
GFCI recep and receps fed through it not working
ESC08-00644 General Inspection9/12/20089/12/20089/12/2008 10:29:40 AMAPASS
sign there and jobsite clean
ELE08-02474 Electrical Rough-In9/11/20089/12/20089/12/2008 10:15:24 AMAPART
Wall and cover inspection need on 3rd floor. Job Foreman; Kelly ###-####. Phone #: ###-#### Internet Inspection Request from: Spencer Mclean
walls 3rd floor ok
ELE08-01960 Electrical Rough-In9/12/20089/12/20089/12/2008 9:03:50 AMAPART
level 4 ceiling wire inspection Phone #: ###-#### Internet Inspection Request from: jesse busack
4th floor ceiling ok
ELE08-01960 Permanent Service9/12/20089/12/20089/12/2008 8:49:27 AMPPART
level 4 ceiling wire inspection Phone #: ###-#### Internet Inspection Request from: jesse busack
ok to energize when ready.
P/S U/G N Ok
ELE08-02486 Rough-In Permanent Service9/9/20089/12/20089/11/2008 7:18:55 PMPCANC
Internet Inspection Request from: Barbara Szurgot Inspection cancelled from web by: Barbara Szurgot
ELE07-00346 Final9/11/20089/12/20089/11/2008 3:40:30 PMACANC
On 1/30/07 we installed a new 200 amp overhead service with a new panel in their new garage. On 1/24/07 we guyed the mast back after they put the roof on. We should have called in for a Final at that time but evidently failed to do so. The owner performed ALL wiring (evidently under our permit WITHOUT our knowledge or permission) and they even called the City to schedule a Rough-In inspection for 9/14/07 which Mike Kinnear performed. Please make sure you charge the owner the Inspection Fees for EVERYTHING except the new service. Thank you, Dan Mitchell @ ###-####. Phone #: ###-#### Internet Inspection Request from: Dan Mitchell Inspection cancelled from web by: Dan Mitchell