Inspections for the day of: Friday, September 12, 2008.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Strole
TitlePLM/MEC-INSPECTOR
Phone #794-7913
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM08-02191 Plumbing Rough-in9/11/20089/12/20089/12/2008 4:30:57 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Ken Jones
PLM08-00792 Plumbing Rough-in9/12/20089/12/20089/12/2008 3:56:53 PMPPASS
This is for Roof Drains. Please contact Darren. Phone #: ###-#### Internet Inspection Request from: Diane Houst-roof drains in front entrance pass.
PLM08-01567 Final9/11/20089/12/20089/12/2008 2:18:40 PMAFAIL
partial final for flower & starbucks-(flower area( need to make area around & under cabinet by floor sink water tight. (starbucks) need to install rpba upstream of R.O. system. esspresso machine needs to be isolated with a rpba. coffee maker needs to be isolated with a dbca. ice maker needs to be isolated with a dbca. glass cleaner hooked up to faucet needs it's own water supply isolated with a rpba or delete.
PLM08-02204 Plumbing Rough-in9/11/20089/12/20089/12/2008 11:34:18 AMAPASS
lee Phone #: ###-####
PLM08-01567 Groundwork9/11/20089/12/20089/12/2008 10:54:24 AMAPART
meat & seafood-ground work in meat & seafood pass.
PLM08-00903 Final9/11/20089/12/20089/12/2008 10:16:56 AMAFAIL
Please contact Ryan at # given. Phone #: ###-#### Internet Inspection Request from: Diane Houst-need shut off valve for water softner, need airgap on softner drain, caulk all shower trim, install jetta tub valve, t&p connot go into water heater pan, dbca for fire system needs tested & certified, need rpba for steam humidifiers.
PLM08-02144 Sprinkler (Final)9/12/20089/12/20089/12/2008 8:21:37 AMANR