Inspections for the day of: Friday, September 12, 2008.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-02854 FIRE-Final Inspection9/12/20089/12/20089/12/2008 4:36:24 PMPPASS
Shell permit fire life safety completed acceptable.
BLD07-02855 FIRE-Final Inspection9/12/20089/12/20089/12/2008 4:34:46 PMPPASS
Shell fire life safety is satisfactory.
BLD07-03163 FIRE-Conference9/11/20089/12/20089/12/2008 4:32:18 PMADONE
Regarding project inspection schedule including related fire alarm and sprinkler permit work.
FIR08-00163 INSP-Final Inspection9/12/20089/12/20089/12/2008 4:30:42 PMPPASS
Fire sprinkler permit finaled.
FIR08-00164 INSP-Final Inspection9/12/20089/12/20089/12/2008 4:30:12 PMPPASS
Fire sprinkler permit finaled.
FIR08-00544 INSP-Sprinkler Rough-in/Hydro9/11/20089/12/20089/12/2008 1:19:16 PMAFAIL
Need to provide documentation addressing the installation of flex type head connections is approved. See item # 13 on the plan review for details. Overhead cover at the drop ceilings is not allowed at this time.
FIR08-00260 INSP-Final Inspection9/12/20089/12/20089/12/2008 11:20:17 AMPDONE
Duplicate inspection request, see project activities for inspections completed to date.
FIR08-00248 INSP-Final Inspection9/12/20089/12/20089/12/2008 11:17:39 AMAPASS
Fire alarm work passed final inspection, locks at the breakers to be installed today, permit finaled.
FIR08-00249 INSP-Final Inspection9/12/20089/12/20089/12/2008 11:15:56 AMAPASS
Fire alarm testing completed satisfactory, contractor to provide locks at the FACP breaker switches today as agreed, permit finaled.
FIR08-00260 INSP-Final Inspection9/12/20089/12/20089/12/2008 10:10:16 AMPPASS
Field testing passed, building map updated, fire alarm permit finaled.
BLD08-00893 FIRE-Final Inspection9/11/20089/12/20089/12/2008 10:08:46 AMAPASS
Shell and restroom remodel fire life safety passed.
FIR08-00552 INSP-Final Inspection9/12/20089/12/20089/12/2008 10:07:24 AMAPASS
Scope of fire alarm permit work finaled.
FIR08-00542 INSP-Final Inspection9/12/20089/12/20089/12/2008 10:06:22 AMAPASS
Necessary corrections are finished, fire sprinkler permit finaled.