FIR08-00239
| INSP-Sprinkler Rough-in | 9/12/2011 | 9/12/2011 | 9/12/2011 4:37:12 PM | P | PART |
|
|
Noted obstructed heads at several locations throughout the parking garage level by adjacent light fixtures, plumbing and mechanical pipe, electrical conduit, etc.
|
FIR08-00239
| INSP-Sprinkler Rough-in | 9/12/2011 | 9/12/2011 | 9/12/2011 4:31:59 PM | P | PART |
|
|
Trip testing for both building 2 and 3 dry system parking garage levels per NFPA 13 24.2.3.2.1 completed satisfactory.
|
BLD11-00456
| FIRE-Final Inspection | 9/9/2011 | 9/12/2011 | 9/12/2011 4:29:30 PM | P | PASS |
|
|
Fire life safety passed pending "door to remain..." signage is posted prior to structural final. Missing suite address posted while on site.
|
FIR11-00267
| INSP-Alarm Testing | 9/12/2011 | 9/12/2011 | 9/12/2011 4:27:31 PM | P | PART |
|
|
Remainder of the new SD at the basement and 1st floor levels tested okay. Final pending repair of one non-functional notification appliance at the 1st floor elevator lobby.
|
BLD11-00416
| FIRE-Final Inspection | 9/12/2011 | 9/12/2011 | 9/12/2011 4:25:21 PM | P | PART |
|
|
Inspection request intended for fire sprinkler cover at the second floor remodeled classroom. Noted one sprinkler head to be replaced due to mechanical damage of the deflector.
|
FIR11-00428
| INSP-Conference | 9/12/2011 | 9/12/2011 | 9/12/2011 4:23:00 PM | P | DONE |
|
|
On site conference regarding conditions per IFC 904.11.1.
|
BLD11-01935
| FIRE-Final Inspection | 9/9/2011 | 9/12/2011 | 9/12/2011 3:56:20 PM | A | FAIL |
|
|
C/N items incomplete
|
FIR11-00249
| INSP-Final Inspection | 9/8/2011 | 9/12/2011 | 9/12/2011 10:24:34 AM | A | PASS |
|
|
Fire alarm testing completed satisfactory. Permit final approved.
|
BLD10-01853
| FIRE-Final Inspection | 9/9/2011 | 9/12/2011 | 9/12/2011 9:55:54 AM | A | PART |
|
|
ron hill - 10:00 Phone #: ###-####
|
BLD11-02049
| FIRE-Final Inspection | 9/9/2011 | 9/12/2011 | 9/12/2011 9:55:17 AM | A | PASS |
|
|
Correction notice items finished. Life safety passed.
|