FIR13-00350
| INSP-Supply line flush | 9/5/2013 | 9/6/2013 | | P | |
|
|
Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
FIR13-00348
| INSP-Supply line flush | 9/5/2013 | 9/6/2013 | | P | |
|
|
Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
FIR13-00487
| INSP-Final Inspection | 9/11/2013 | 9/12/2013 | 9/12/2013 5:30:43 PM | P | PART |
|
|
Final pending points map at the panel, zones 5 and 6 are reversed, need record of completion paperwork. Plugs at duct detector removed while on site. Remainder of inspection items passed including MP station, SD, kitchen hood, flow and tamper, DD, panel batteries, panel items.
|
FIR13-00230
| INSP-Sprinkler Rough-in/Hydro | 9/11/2013 | 9/12/2013 | 9/12/2013 5:22:56 PM | P | FAIL |
|
|
Time limitations per NFPA 13 for dry system water delivery were exceeded for the 1st floor system.
|
FIR13-00446
| INSP-Final Inspection | 9/11/2013 | 9/12/2013 | 9/12/2013 5:18:54 PM | P | FAIL |
|
|
Need to adjust distance from the nozzles to the cooking appliances per mfg. data sheets.
|
FIR13-00482
| INSP-Sprinkler Rough-in | 9/11/2013 | 9/12/2013 | 9/12/2013 5:16:50 PM | P | PART |
|
|
Inspection for work completed to date okayed.
|
FIR13-00463
| INSP-Final Inspection | 9/11/2013 | 9/12/2013 | 9/12/2013 5:12:11 PM | P | PASS |
|
|
Hood suppression system operated correctly under test conditions. Permit finaled.
|
FIR13-00230
| INSP-Sprinkler Rough-in/Hydro | 9/11/2013 | 9/12/2013 | 9/12/2013 12:02:26 PM | A | PART |
|
|
Completed hydrostatic testing of the new dry system piping at the 4th, 5th floors, and riser.
|
FIR12-00090
| FIR-Aging Inspection | 9/12/2013 | 9/12/2013 | 9/12/2013 11:02:29 AM | | PEND |
|
|
|
FIR12-00302
| FIR-Aging Inspection | 9/12/2013 | 9/12/2013 | 9/12/2013 11:01:26 AM | | PEND |
|
|
|
FIR12-00299
| FIR-Aging Inspection | 9/12/2013 | 9/12/2013 | 9/12/2013 11:00:06 AM | | PEND |
|
|
|
FIR13-00266
| INSP-Sprinkler Rough-in | 9/11/2013 | 9/12/2013 | 9/12/2013 10:46:27 AM | A | PART |
|
|
Items on the previous correction notice are not yet finished at some locations including ssu's at the ramp, missing seismic brace, missing section of galv pipe, trapped outlet. Verified missing coverage has been added, hangers adjusted, head cages on, adjustments, etc. are finished. New valve and trim monitoring not yet finished. Discussed trip test schedule.
|
FIR13-00434
| INSP-Sprinkler Rough-in | 9/11/2013 | 9/12/2013 | 9/12/2013 10:38:40 AM | A | PART |
|
|
Inspection for hanger attatchments above the sheetrock lid in the three new rooms at the production area okayed for cover. Also completed rough-in for the new and relocated uprights due to wall construction.
|
FIR13-00424
| INSP-Final Inspection | 9/11/2013 | 9/12/2013 | 9/12/2013 10:34:47 AM | A | PART |
|
|
Okay to cover overhead fire sprinkler work at the grid ceilings in the tenant remodel area.
|