BLD14-01229
| BLD-Final | 9/11/2014 | 9/12/2014 | 9/12/2014 3:35:08 PM | P | FAIL |
|
|
Pat Phone #: ###-####. needs plumbing final. Also needs to provide ADA restroomsign and post, remount the vertical grab bar to 39 -41 inces from floor, remount mirror so that reflective surface is 40 inches max above floor.
|
BLD13-03540
| BLD-Energy code compliance | 9/10/2014 | 9/12/2014 | 9/12/2014 2:30:51 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD13-03545
| BLD-Energy code compliance | 9/10/2014 | 9/12/2014 | 9/12/2014 2:30:37 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD14-00204
| BLD-Framing/Rough-in | 9/11/2014 | 9/12/2014 | 9/12/2014 1:51:49 PM | P | FAIL |
|
|
Richard Phone #: ###-####. Repair, and complete draft stop in attic areas. Provide h2.5 at interio bearing wall to trusses, fireblock all furdowns, seal all penetrations thru draft stop.
|
BLD14-00208
| BLD-Wall Bracing | 9/12/2014 | 9/12/2014 | 9/12/2014 1:50:05 PM | P | PASS |
|
|
Richard Phone #: ###-####. 1st. floor exterior walls ok.
|
BLD14-02409
| BLD-Framing/Rough-in | 9/10/2014 | 9/12/2014 | 9/12/2014 10:22:24 AM | A | PASS |
|
|
Randy-please call before Phone #: ###-####. wall infill ok.
|
BLD14-01399
| BLD-Final | 9/11/2014 | 9/12/2014 | 9/12/2014 9:47:11 AM | A | PASS |
|
|
Final Phone #: ###-#### Inspection requested via web by greg bauer
|
BLD14-01399
| DOC - Permit Finaled | 9/12/2014 | 9/12/2014 | 9/12/2014 9:46:54 AM | P | PASS |
|
|
|
BLD14-00207
| BLD-Wall Bracing | 9/11/2014 | 9/12/2014 | 9/12/2014 9:05:01 AM | A | PASS |
|
|
Richard Phone #: ###-####. 2nd floor interior shear walls ok.
|
BLD14-00214
| BLD-Wall Bracing | 9/11/2014 | 9/12/2014 | 9/12/2014 9:03:43 AM | A | PASS |
|
|
Richard Phone #: ###-####. 2nd floor interior shear walls ok.
|
BLD13-03545
| BLD-Conference | 9/10/2014 | 9/12/2014 | 9/10/2014 11:16:51 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Brian Stark Inspection cancelled from web by: Brian Stark
|