Inspections for the day of: Friday, September 12, 2014.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00437 General Inspection9/12/20149/12/20149/12/2014 3:37:33 PM PASS
Bronco Motors project in progress. No trackout to Fairview or non-stormwater discharges observed. No corrections required.
ESC13-00655 General Inspection9/12/20149/12/20149/12/2014 3:20:55 PM PASS
ESC14-00423 General Inspection9/12/20149/12/20149/12/2014 3:03:23 PM PASS
WIP. No violations.
ESC13-01024 BMP Violation9/12/20149/12/20149/12/2014 2:06:41 PMPPASS
Correction request to install DI filter bags Honeycomb and Wolftree is complete.

Street will be swept this weekend.
ESC14-00783 Complaint Inspection9/12/20149/12/20149/12/2014 1:59:00 PMPPART
No site prep scheduled.

Notified foremen of the site prep requirement. Commercial demo project. No stormwater structures or surface water at site; low risk. No violations observed.
ESC14-00499 Complaint Inspection9/12/20149/12/20149/12/2014 1:48:55 PMPPASS
investigate report that work is occuring with no site prep?

2 BLD projects are occuring at Campbell Company with two ESC permits issued. Site prep inspection was conducted under ESC14-00514 on 8/28/2014.

Permit posted, BMPs installed, no violations observed.
ESC14-00097 Aging Inspection9/12/20149/12/20149/12/2014 11:47:40 AM PASS
ESC14-00451 General Inspection9/12/20149/12/20149/12/2014 11:33:22 AM PASS
Lean-to at Ore Pac is complete. Some minor construction remaining. No violations observed.
ESC14-00167 DOC - Permit Finaled9/12/20149/12/20149/12/2014 11:21:47 AMPPASS
Home complete, landscaped and occupied. All permits finaled.
ESC13-00925 DOC - Permit Finaled9/12/20149/12/20149/12/2014 11:20:14 AMPPASS
Sunny Ridge Pool is complete and surrounding area stabilized.
ESC14-00472 DOC - Permit Finaled9/12/20149/12/20149/12/2014 11:17:29 AMPPASS
Construction complete, homesite is clean and landscaped. No further inspections required.
ESC14-00252 DOC - Permit Finaled9/12/20149/12/20149/12/2014 11:15:03 AMPPASS
Home complete, site is clean, landscaped and occupied. ESC conditions satisfied.
ESC14-00428 DOC - Permit Finaled9/12/20149/12/20149/12/2014 11:13:32 AMPPASS
House complete, landscaped, and occupied. All permits finaled.
ESC14-00051 DOC - Permit Finaled9/12/20149/12/20149/12/2014 11:10:47 AMPPASS
House complete, landscaped, and occupied. ESC conditions satisfied.
ESC14-00033 Aging Inspection9/12/20149/12/20149/12/2014 11:08:53 AM PASS
Finaled.
ESC14-00033 DOC - Permit Finaled9/12/20149/12/20149/12/2014 11:08:39 AMPPASS
House complete and landscaped. No ESC corrections needed. Permit finaled.
ESC13-00449 Tracking Control9/11/20149/12/20149/12/2014 10:52:45 AMAPART
Site was swept at end of day yesterday. No activity at time of inspection and gate to site was locked. Despite the sweeping performed, there is still some trackout in front of site.

Correction request for sweeper vacuum service.
ESC13-01159 General Inspection9/12/20149/12/20149/12/2014 10:03:55 AM PASS
No construction activity at time of inspection. BMPs: drop inlet protection on new stormwater inlets, silt fence perimeter next to creek is installed.No trash or trackout from site.

New stormwater swale has been surrounded by safety fence per request of ACHD earlier this week.
ESC14-00441 DOC - Permit Finaled9/12/20149/12/20149/12/2014 9:50:04 AMPPASS
ESC14-00441 Site Final9/9/20149/12/20149/12/2014 9:39:20 AMPPASS
Check that gutter has been swept by Idaho Power per correction request issued Tuesday 9/9

Corrections complete. Gutter has been swept. ESC conditions satisfied.
ESC11-00879 General Inspection9/12/20149/12/20149/12/2014 8:58:21 AM PASS