Inspections for the day of: Monday, September 12, 2016.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE16-00151 Electrical Rough-In9/11/20169/12/20169/12/2016 4:41:31 PMPPASS
Partial ceiling cover inspection. Contact is Eric Gibson ###-####. If he doesn''t answer contact Toby Groves ###-####. Phone #: ###-#### Inspection requested via web by Toby Groves
As noted on contractor print basement grid rough in ok cover. Will check TVR lobby luminaires earthquake clips next trip
ELE16-00089 Electrical Rough-In9/12/20169/12/20169/12/2016 4:38:49 PMPPASS
Call Rafael for inspection of 4th floor lobby high grid ceiling area. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Area as noted grid rough in ok cover
ELE15-00495 Electrical Rough-In9/12/20169/12/20169/12/2016 4:38:01 PMPPASS
Ceiling for cover inspection Prefunction areas 2nd and 4th floor.
Walk core and shell to look for possible TCO issues.
Contact is Toby Groves ###-####
Phone #: ###-#### Inspection requested via web by Toby Groves 4 floor bath hardlid rough in ok cover, Discussed fire caulking, finish all egress paths, euipment room and gear labels, panic hardware on all electrical room doors with gear rated 800 amp or more.
ELE16-02953 Electrical Rough-In9/12/20169/12/20169/12/2016 2:27:58 PMPCANC
Someone should be there all day. Please call with any questions. Thank you Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman

duplicate request
ELE16-02953 Electrical Rough-In9/12/20169/12/20169/12/2016 2:27:25 PMPPASS
Someone should be there all day. Please call with any questions. Thank you Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman

upstair of detached garage...kitchen addition...bath heat and fan...mini split circuit....water heater circuit...rough in ok to cover
ELE16-02463 Final9/12/20169/12/20169/12/2016 2:05:58 PMPPASS
We are requesting a final inspection for this afternoon. Our contact is Bryant @ ###-####. Thank you Phone #: ###-#### Inspection requested via web by Clint Tate

no corrections ok to final
ELE13-01291 Electrical Rough-In9/9/20169/12/20169/12/2016 1:52:53 PMAPASS
underground south of Annex. call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson one pole base not ready area noted ok to cover. 3 north flag pole ground rods verify length and specs
ELE15-01348 Electrical Rough-In9/12/20169/12/20169/12/2016 1:45:13 PMPPASS
Level 5 Annex Men''s bathroom ceiling. Phone #: ###-#### Inspection requested via web by Brandon Robinson mens bathroom annex 5th floor...ok to cover hard lid
ELE15-00495 Electrical Rough-In9/11/20169/12/20169/12/2016 10:26:05 AMPCANC
Pre TCO walk for District 5 story. Walk to identify items that may need taken care of for TCO later in the week. Contact is Toby Groves ###-#### Phone #: ###-#### >> Inspection requested via web by Toby Groves Inspection cancelled from web by: Toby Groves
ELE16-02510 Electrical Rough-In9/9/20169/12/20169/12/2016 9:22:33 AMAPASS
CEILING ROUGH-IN INSPECTION

CONTACT: SID @ ###-#### Phone #: ###-#### Inspection requested via web by JENNY EMEL additional flourescents added and pendants over reception desk....ok to cover
ELE16-02510 Final9/12/20169/12/20169/12/2016 9:20:42 AMPPASS
CEILING ROUGH-IN INSPECTION

CONTACT: SID @ ###-#### Phone #: ###-#### Inspection requested via web by JENNY EMEL Final ok
ELE16-02886 Conference9/9/20169/12/20169/12/2016 8:47:29 AMADONE
Bldg will be zoned townhouse in future. Need to consult to determine best move forward. Phone #: ###-#### Inspection requested via web by David McClellan
Discussed wiring as townhouses so all shall be seperated as 2 seperate dwellings. No penatrations in center firewall.