ELE16-00151
| Electrical Rough-In | 9/11/2016 | 9/12/2016 | 9/12/2016 4:41:31 PM | P | PASS |
|
|
Partial ceiling cover inspection. Contact is Eric Gibson ###-####. If he doesn''t answer contact Toby Groves ###-####. Phone #: ###-#### Inspection requested via web by Toby Groves As noted on contractor print basement grid rough in ok cover. Will check TVR lobby luminaires earthquake clips next trip
|
ELE16-00089
| Electrical Rough-In | 9/12/2016 | 9/12/2016 | 9/12/2016 4:38:49 PM | P | PASS |
|
|
Call Rafael for inspection of 4th floor lobby high grid ceiling area. Phone #: ###-#### Inspection requested via web by Rafael Castillo Area as noted grid rough in ok cover
|
ELE15-00495
| Electrical Rough-In | 9/12/2016 | 9/12/2016 | 9/12/2016 4:38:01 PM | P | PASS |
|
|
Ceiling for cover inspection Prefunction areas 2nd and 4th floor. Walk core and shell to look for possible TCO issues. Contact is Toby Groves ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves 4 floor bath hardlid rough in ok cover, Discussed fire caulking, finish all egress paths, euipment room and gear labels, panic hardware on all electrical room doors with gear rated 800 amp or more.
|
ELE16-02953
| Electrical Rough-In | 9/12/2016 | 9/12/2016 | 9/12/2016 2:27:58 PM | P | CANC |
|
|
Someone should be there all day. Please call with any questions. Thank you Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman
duplicate request
|
ELE16-02953
| Electrical Rough-In | 9/12/2016 | 9/12/2016 | 9/12/2016 2:27:25 PM | P | PASS |
|
|
Someone should be there all day. Please call with any questions. Thank you Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman
upstair of detached garage...kitchen addition...bath heat and fan...mini split circuit....water heater circuit...rough in ok to cover
|
ELE16-02463
| Final | 9/12/2016 | 9/12/2016 | 9/12/2016 2:05:58 PM | P | PASS |
|
|
We are requesting a final inspection for this afternoon. Our contact is Bryant @ ###-####. Thank you Phone #: ###-#### Inspection requested via web by Clint Tate
no corrections ok to final
|
ELE13-01291
| Electrical Rough-In | 9/9/2016 | 9/12/2016 | 9/12/2016 1:52:53 PM | A | PASS |
|
|
underground south of Annex. call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson one pole base not ready area noted ok to cover. 3 north flag pole ground rods verify length and specs
|
ELE15-01348
| Electrical Rough-In | 9/12/2016 | 9/12/2016 | 9/12/2016 1:45:13 PM | P | PASS |
|
|
Level 5 Annex Men''s bathroom ceiling. Phone #: ###-#### Inspection requested via web by Brandon Robinson mens bathroom annex 5th floor...ok to cover hard lid
|
ELE15-00495
| Electrical Rough-In | 9/11/2016 | 9/12/2016 | 9/12/2016 10:26:05 AM | P | CANC |
|
|
Pre TCO walk for District 5 story. Walk to identify items that may need taken care of for TCO later in the week. Contact is Toby Groves ###-#### Phone #: ###-#### >> Inspection requested via web by Toby Groves Inspection cancelled from web by: Toby Groves
|
ELE16-02510
| Electrical Rough-In | 9/9/2016 | 9/12/2016 | 9/12/2016 9:22:33 AM | A | PASS |
|
|
CEILING ROUGH-IN INSPECTION
CONTACT: SID @ ###-#### Phone #: ###-#### Inspection requested via web by JENNY EMEL additional flourescents added and pendants over reception desk....ok to cover
|
ELE16-02510
| Final | 9/12/2016 | 9/12/2016 | 9/12/2016 9:20:42 AM | P | PASS |
|
|
CEILING ROUGH-IN INSPECTION
CONTACT: SID @ ###-#### Phone #: ###-#### Inspection requested via web by JENNY EMEL Final ok
|
ELE16-02886
| Conference | 9/9/2016 | 9/12/2016 | 9/12/2016 8:47:29 AM | A | DONE |
|
|
Bldg will be zoned townhouse in future. Need to consult to determine best move forward. Phone #: ###-#### Inspection requested via web by David McClellan Discussed wiring as townhouses so all shall be seperated as 2 seperate dwellings. No penatrations in center firewall.
|