Inspections for the day of: Tuesday, September 12, 2017.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-03489 FIRE-Conference9/12/20179/12/20179/12/2017 4:37:21 PMPDONE
Fire conference for TCO discussion complete.
BLD17-01694 FIRE-Conference9/11/20179/12/20179/12/2017 10:21:48 AMADONE
Fire conference complete. Contractor installing the storage racks is working on getting a racking permit due to storage elevation exceeding 8 feet. Noted that the project for D&B does not have a FIR permit issued for the fire sprinkler system modifications, only FIR permit issued for the space is FIR17-00203 for demo work on the old Hastings tenant. Fire sprinkler heads will need to be added around the northeast and northwest HVAC penetrations. Janitor closet in the back off of the sales floor will need to have a sprinkler head installed in the fitting provided for the fire sprinkler head. Two fire sprinkler heads on the southwest area of old entry will need to be changed to dry pendants.
BLD17-03217 FIRE-Final Inspection9/11/20179/12/20179/12/2017 9:03:17 AMAPASS
No fire sprinklers, no fire alarms, fire extinguisher will be mounted in discussed location, noted that both the east and the west exits have thumbturn deadbolts. Final life fire safety for this permit passed/complete.