ELE18-03025
| Rough-In Permanent Service | 9/12/2018 | 9/12/2018 | 9/12/2018 3:19:55 PM | P | PASS |
|
|
Contact is Matt Brown, ###-#### Phone #: ###-#### Inspection requested via web by Scott Campbell p/s u/g n ok
|
ELE18-02143
| Final | 9/12/2018 | 9/12/2018 | 9/12/2018 2:46:17 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall Ok final.
|
ELE18-01880
| Final | 9/12/2018 | 9/12/2018 | 9/12/2018 2:46:03 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall Ok final.
|
ELE18-01765
| Final | 9/12/2018 | 9/12/2018 | 9/12/2018 2:45:49 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall Ok final.
|
ELE18-01766
| Final | 9/12/2018 | 9/12/2018 | 9/12/2018 2:45:34 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall Ok final
|
ELE18-03494
| Temporary Service | 9/12/2018 | 9/12/2018 | 9/12/2018 2:13:14 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by William Andrews t/s o/h n ok
|
ELE18-03357
| Final | 9/12/2018 | 9/12/2018 | 9/12/2018 1:48:54 PM | P | PASS |
|
|
All necessary paper work is in meter pack. Both back gates are open if owner doesn’t answer. No pets in back yard Thanks Mike Phone #: ###-#### Inspection requested via web by michael hunt Ok final.
|
ELE18-03471
| Electrical Rough-In | 9/11/2018 | 9/12/2018 | 9/12/2018 1:27:37 PM | P | PASS |
|
|
Entrance through man gate on north side of property. Lock box on back man door. Code 1958. Please call with any questions. Phone #: ###-#### Inspection requested via web by Cortney Hopper Ok cover bed/bath.
|
MIS18-00327
| Set Bond Amount | 9/6/2018 | 9/12/2018 | 9/12/2018 1:27:06 PM | A | CANC |
|
|
Chad ###-####. ADU done in 2003 range. No permits. Already lived in and functioning. Will talk to Daryl Degrange on situation. Re-scheduled from 9/12/18
|
ELE18-02184
| Electrical Rough-In | 9/12/2018 | 9/12/2018 | 9/12/2018 12:44:46 PM | P | PASS |
|
|
Chris is the contact his cell is ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates Ok cover walls kitchen.
|
ELE18-03472
| Permanent Service | 9/11/2018 | 9/12/2018 | 9/12/2018 12:44:19 PM | P | PASS |
|
|
Energize new service Phone #: ###-#### Inspection requested via web by Douglas Hackney p/s o/h n ok
|
ELE18-02518
| Final | 9/12/2018 | 9/12/2018 | 9/12/2018 12:31:07 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk Ok final.
|
ELE18-03481
| Permanent Service | 9/11/2018 | 9/12/2018 | 9/12/2018 11:20:02 AM | A | PASS |
|
|
Service change with utility shutdown. Should be ready for inspection by late morning. Contact Heath @ ###-#### or Jason @ ###-#### with questions. Phone #: ###-#### Inspection requested via web by Heath Thomas New 200a panel exterior and re-feeding 100a interior. Ufer was able to be used. p/s u/g n ok
|
ELE18-03474
| Final | 9/11/2018 | 9/12/2018 | 9/12/2018 11:15:12 AM | A | PASS |
|
|
Made connection at well casing Phone #: ###-#### Inspection requested via web by Susan Echols Ok final. Approved splice method from existing conductors to new for connection to well head.
|
ELE18-03289
| Final | 9/11/2018 | 9/12/2018 | 9/12/2018 11:06:55 AM | A | PASS |
|
|
Call Jay ###-#### Phone #: ###-#### Inspection requested via web by Seth Stears Ok final. Labels present.
|
ELE18-02530
| Final | 9/12/2018 | 9/12/2018 | 9/12/2018 10:36:27 AM | A | PASS |
|
|
Call Brad (###-####) for access Phone #: ###-#### Inspection requested via web by Brad Girard Ok final. 2 LOs needed. Micro and hood. Talked to Brad, he is going to take care of it and send pics.
|
ELE18-02251
| Final | 9/11/2018 | 9/12/2018 | 9/12/2018 10:35:27 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Terry Scott Ok final 2 baths. GFI for floor heat in mstr functions properly.
|
ELE18-03475
| Rough-In Permanent Service | 9/11/2018 | 9/12/2018 | 9/12/2018 9:54:13 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Louis Keller Was supposed to be a roughin only. No service.
|
ELE18-03475
| Electrical Rough-In | 9/12/2018 | 9/12/2018 | 9/12/2018 9:44:33 AM | A | PASS |
|
|
Ok cover down bath. ###-####
|
ELE18-03482
| Electrical Rough-In | 9/11/2018 | 9/12/2018 | 9/12/2018 9:38:38 AM | A | PASS |
|
|
Soffit cams Phone #: ###-#### Inspection requested via web by danny perrine Ok cover cans. 8 up and 3 down.
|
ELE18-01005
| Final | 9/10/2018 | 9/12/2018 | 9/12/2018 8:59:45 AM | A | PASS |
|
|
Swimming pool electrical final Phone #: ###-#### Inspection requested via web by Lars Johnson Ok final.
|
ELE12-02415
| ELE-Aging Inspection | 9/12/2018 | 9/12/2018 | 9/12/2018 7:14:39 AM | | FAIL |
|
|
Schedule a final..
|