MIS19-00294
| Set Bond Amount | 9/12/2019 | 9/12/2019 | 9/12/2019 3:03:30 PM | P | DONE |
|
|
demo for 1 SFD, 1 garage, 1 callapsed pole bldg & 1 storage bldg-Manum Demolition says their amount is $16,100.00. $16K demo bond required.
|
MIS19-00295
| Set Bond Amount | 9/12/2019 | 9/12/2019 | 9/12/2019 3:02:55 PM | P | DONE |
|
|
demo of SFD, 1 chicken coop 1 garage-per Magnum amount is $12,400.00. $12400.00 demo bond required
|