BLD00-02067
| BLD-Framing/Rough-in | 9/12/2000 | 9/13/2000 | 9/13/2000 12:00:00 AM | A | PART |
|
|
###-#### still need to verify drag strut 16 ft 4 oc #8 w/ mb 4 locations. 9/13/2000 4:04:12 PM
|
BLD00-01728
| BLD-Final | 9/12/2000 | 9/13/2000 | 9/13/2000 12:00:00 AM | A | PASS |
|
|
###-#### final ok 9/13/2000 9:13:13 AM
|
BLD00-02101
| BLD-Framing/Rough-in | 9/12/2000 | 9/13/2000 | 9/13/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/12/2000 at 13:27:57. Contact: . trans. to p pain in the area. 9/13/2000 10:15:16 AM
|
BLD00-00286
| BLD-Concrete | 9/12/2000 | 9/13/2000 | 9/13/2000 12:00:00 AM | A | PART |
|
|
bruce ###-#### masonary covered with special insp. pending report. 9/13/2000 8:02:51 AM
|
BLD00-01873
| BLD-Energy code compliance | 9/12/2000 | 9/13/2000 | 9/13/2000 12:00:00 AM | A | FAIL |
|
|
tom-- ###-#### energy code refur to notes in framing insp. 9/13/2000 12:22:55 PM
|
BLD00-01873
| BLD-Framing/Rough-in | 9/12/2000 | 9/13/2000 | 9/13/2000 12:00:00 AM | A | FAIL |
|
|
tom ###-#### re-insp fr no aproved plans or truss engineering on site to verrify c/n perviously written. 9/13/2000 12:22:24 PM
|
MEC00-03076
| Rough-in | 9/12/2000 | 9/13/2000 | 9/13/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/12/2000 at 17:06:54. Contact: ###-####. trans to p paine in the area. 9/13/2000 10:15:40 AM
|
BLD00-00340
| BLD-Final | 9/13/2000 | 9/13/2000 | 9/13/2000 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 301 On 9/13/2000 final ok card with micron. l/c. 9/13/2000 12:04:33 PM
|
BLD00-01732
| BLD-Final | 9/13/2000 | 9/13/2000 | 9/13/2000 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 301 On 9/13/2000 final ok l/c card with micron.
|
BLD00-01563
| BLD-Concrete | 9/8/2000 | 9/13/2000 | 9/13/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 14:07:34. Contact: ###-####. placed with special insp. pending reports. 9/13/2000 5:53:02 PM
|
BLD00-00850
| BLD-Final | 9/13/2000 | 9/13/2000 | 9/13/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/13/2000 at 06:56:00. Contact: ###-####. need sprinkler support under stair. 9/13/2000 4:21:01 PM
|
BLD00-01473
| BLD-Framing/Rough-in | 9/13/2000 | 9/13/2000 | 9/13/2000 12:00:00 AM | P | PART |
|
|
Dante ###-#### soffit gyp ok for cover. 9/13/2000 12:23:42 PM
|
BLD00-01777
| BLD-Final | 9/13/2000 | 9/13/2000 | 9/13/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/13/2000 at 08:25:38. Contact: ###-####. walkways ok stairs and handrails ok pending canopys. 9/13/2000 5:40:00 PM
|
BLD00-02147
| BLD-Framing/Rough-in | 9/13/2000 | 9/13/2000 | 9/13/2000 12:00:00 AM | P | FAIL |
|
|
SHEAR WALL -JEFF-- ###-#### no aproved plan on site apears to have brace panels in wrong locations. 9/13/2000 5:51:52 PM
|
BLD00-01726
| BLD-Concrete | 9/13/2000 | 9/13/2000 | 9/13/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/13/2000 at 10:14:21. Contact: ###-####. covered with special insp. pending reports. 9/13/2000 5:52:35 PM
|