Inspections for the day of: Thursday, September 13, 2001.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01830 BLD-Wall cover9/12/20019/13/20019/13/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/12/2001 at 09:41:04. Contact: ###-####. Shear OK 9/13/2001 10:16:43 AM
BLD01-01962 BLD-Energy code compliance9/12/20019/13/20019/13/2001 12:00:00 AMAPASS
kole ###-#### Frame pass 9/13/2001 9:39:05 AM
BLD01-02365 BLD-Foundation9/12/20019/13/20019/13/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/12/2001 at 17:08:44. Contact: ###-####.
BLD01-02362 BLD-Foundation9/12/20019/13/20019/13/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/12/2001 at 17:09:52. Contact: ###-####.
BLD01-01456 BLD-Framing/Rough-in9/12/20019/13/20019/13/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 09/12/2001 at 17:35:35. Contact: ###-####. C/N posted 9/13/2001 9:32:45 AM
BLD01-02361 BLD-Footing9/13/20019/13/20019/13/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/13/2001 at 07:48:05. Contact: ###-####.
BLD99-03116 BLD-Conference9/13/20019/13/20019/13/2001 12:00:00 AMPPART
###-#### Tom 1st check 1 hr shafts. 9/14/2001 8:05:12 AM
BLD01-01701 BLD-Final9/13/20019/13/20019/13/2001 12:00:00 AMPPASS
###-#### C/C issued. 9/14/2001 8:05:30 AM
BLD01-01830 BLD-Framing/Rough-in9/12/20019/13/20019/12/2001 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 09/12/2001 at 09:37:17. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/12/2001 at 09:39:45.