BLD01-01538
| FIRE-Final Inspection | 9/12/2001 | 9/13/2001 | 9/13/2001 12:00:00 AM | A | PART |
|
|
###-#### call first temp approved per Dave Miller and completion of duct detectors to alarm panel and approval of plans; high pile storage racks installed without plans. talked to rep of schindler and he said they will be submitted as soon as possible 9/13/2001 9:11:28 AM
|
BLD01-02387
| FIRE-Final Inspection | 9/12/2001 | 9/13/2001 | 9/13/2001 12:00:00 AM | A | PASS |
|
|
ray ###-#### structural is also going out am they will have the "Door to remain unlocked..." sign on front exit for structural inspector 9/13/2001 9:53:33 AM
|
BLD98-03479
| FIRE-Final Inspection | 9/12/2001 | 9/13/2001 | 9/13/2001 12:00:00 AM | A | PASS |
|
|
Tammy, ###-####
|
FIR01-00202
| INSP-Final Inspection | 9/13/2001 | 9/13/2001 | 9/13/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/13/2001 at 08:14:24. Contact: ###-####.
|
BLD01-01223
| FIRE-Final Inspection | 9/13/2001 | 9/13/2001 | 9/13/2001 12:00:00 AM | P | PASS |
|
|
|