BLD01-02348
| BLD-Footing | 9/12/2001 | 9/13/2001 | 9/13/2001 12:00:00 AM | A | PART |
|
|
###-####
wip, ok w/ verbal corrections 9/13/2001 10:25:03 AM
|
BLD01-01609
| BLD-Framing/Rough-in | 9/12/2001 | 9/13/2001 | 9/13/2001 12:00:00 AM | A | PASS |
|
|
dan- ###-#### r/i
insulation ok also 9/13/2001 12:04:25 PM
|
BLD01-02164
| BLD-Conference | 9/12/2001 | 9/13/2001 | 9/13/2001 12:00:00 AM | A | PART |
|
|
water spring is under pool area, contractor put a pump devise under for control if needed 9/13/2001 12:16:21 PM 9/13/2001 12:17:01 PM
|
BLD01-02142
| BLD-Final | 9/12/2001 | 9/13/2001 | 9/13/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-02504
| BLD-Footing | 9/12/2001 | 9/13/2001 | 9/13/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/12/2001 at 15:59:21. Contact: ###-####.
|
BLD01-02504
| BLD-Framing/Rough-in | 9/12/2001 | 9/13/2001 | 9/13/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/12/2001 at 16:00:12. Contact: ###-####.
|
BLD00-01086
| BLD-Final | 9/13/2001 | 9/13/2001 | 9/13/2001 12:00:00 AM | P | PART |
|
|
###-####
ok for c of c after trade signoffs are done, (mainly Terry Records) 9/13/2001 3:12:02 PM
|
BLD01-01657
| BLD-Foundation | 9/13/2001 | 9/13/2001 | 9/13/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/13/2001 at 10:48:38. Contact: ###-####.
|
BLD01-00938
| BLD-Footing | 9/13/2001 | 9/13/2001 | 9/13/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by Inspector: 415 On 9/13/2001 11:16:07 AM
|
BLD00-02884
| BLD-Final | 9/13/2001 | 9/13/2001 | 9/13/2001 12:00:00 AM | P | NR |
|
|
Al ###-#### 9/13/2001 11:22:18 AM
|
BLD01-01938
| BLD-Footing | 9/13/2001 | 9/13/2001 | 9/13/2001 12:00:00 AM | P | PART |
|
|
chris ###-#### 9/13/2001 11:22:46 AM
great room epoxy cololm bolts, 8 total,,, t/w arch. via phone on procedure, ok 9/13/2001 2:17:09 PM
|