Inspections for the day of: Friday, September 13, 2002.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-02812 Plumbing Rough-in9/12/20029/13/20029/13/2002 12:00:00 AMAPASS
JERRY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
PLM02-02757 Water and/or Sewer9/12/20029/13/20029/13/2002 12:00:00 AMAPASS
###-####
PLM02-02776 Water and/or Sewer9/12/20029/13/20029/13/2002 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Pam Masselli
PLM02-02838 Water and/or Sewer9/12/20029/13/20029/13/2002 12:00:00 AMAPART
###-#### sewer line ok need to change water line to 1-1/4 as per plan told contractor on job site will recall when ready 9/13/2002 12:31:24 PM
PLM02-02838 Roof Drains9/12/20029/13/20029/13/2002 12:00:00 AMAFAIL
need to re-do roof drain,s lower piping and grade told contractor on job site will re call when ready 9/13/2002 12:30:23 PM
PLM02-02722 Final9/12/20029/13/20029/13/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/12/2002 at 19:27:37. Contact: ###-####.
PLM02-02110 Plumbing Rough-in9/13/20029/13/20029/13/2002 12:00:00 AMPPART
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung need to vent basement floor drain . make tie in for crawl space and over head plumbing in to basement building drain 9/13/2002 3:35:16 PM
PLM02-02463 Final9/13/20029/13/20029/13/2002 12:00:00 AMPFAIL
dave; Phone #: ###-#### Internet Inspection Request from: Darla Downs need rp tested and certified provide grates for floor sink,s need floor clean out cover pipe food prep. sink to floor sink provide seprate water supply to soap dispencer if used contractor to recall when ready 9/13/2002 4:27:32 PM