BLD02-01095
| BLD-Final | 9/11/2002 | 9/13/2002 | 9/13/2002 12:00:00 AM | A | PASS |
|
|
key is on top of elec meter box to let you in the garage; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung c.c # 17628 issued 9/13/2002 9:20:50 AM
|
BLD02-01915
| BLD-Final | 9/12/2002 | 9/13/2002 | 9/13/2002 12:00:00 AM | A | NR |
|
|
###-#### needs to finish steps and hand rails 9/13/2002 11:45:50 AM
|
MEC02-02532
| Pressure Test | 9/12/2002 | 9/13/2002 | 9/13/2002 12:00:00 AM | A | PASS |
|
|
please inspect as late in am as possible. Call me first so I can make sure they are ready for you.
thanks
Carol; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen
|
BLD02-01979
| BLD-Foundation | 9/13/2002 | 9/13/2002 | 9/13/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/13/2002 at 06:30:08. Contact: ###-####. work in progress 90% complete 9/13/2002 11:53:42 AM
|
MEC02-02531
| Rough-in | 9/13/2002 | 9/13/2002 | 9/13/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/13/2002 at 08:02:43. Contact: ###-####.
|
MEC02-02548
| Rough-in | 9/13/2002 | 9/13/2002 | 9/13/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/13/2002 at 09:54:52. Contact: ###-####.c/n items have been completed 9/13/2002 1:18:14 PM
|
MEC02-01694
| Final | 9/13/2002 | 9/13/2002 | 9/13/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 09/13/2002 at 10:28:10. Contact: ###-####.
|
MEC02-02531
| Pressure Test | 9/13/2002 | 9/13/2002 | 9/13/2002 12:00:00 AM | P | PASS |
|
|
|
BLD02-02007
| BLD-Framing/Rough-in | 9/12/2002 | 9/13/2002 | 9/13/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/12/2002 at 15:57:50. Contact: ###-####.
|
BLD02-00696
| BLD-Framing/Rough-in | 9/11/2002 | 9/13/2002 | 9/13/2002 12:00:00 AM | P | PART |
|
|
###-#### james shear ok to cover ext ok to insulate need engineer to check beam connections and bearing on beam at entry way old house to new addition 9/13/2002 3:21:35 PM
|