Inspections for the day of: Monday, September 13, 2004.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Arcoraci
TitleBLD-COM/RES INSPECTOR
Phone #794-9368
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-02873 BLD-Aging Inspection9/13/20049/13/20049/13/2004 12:00:00 AM CANC
BLD03-00697 BLD-Aging Inspection9/13/20049/13/20049/13/2004 12:00:00 AM NR
BLD04-00205 BLD-Aging Inspection9/13/20049/13/20049/13/2004 12:00:00 AM PASS
MEC04-02416 Rough-in9/10/20049/13/20049/13/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 9/10/2004 at 7:54:55 AM. Contact: ###-####.
MEC04-02416 Pressure Test9/10/20049/13/20049/13/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 9/10/2004 at 7:55:16 AM. Contact: ###-####.
MEC04-02324 Rough-in9/10/20049/13/20049/13/2004 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
MEC04-02324 Pressure Test9/10/20049/13/20049/13/2004 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
MEC04-02139 Final9/10/20049/13/20049/13/2004 12:00:00 AMPPASS
after 2 pm
BLD04-00435 BLD-Framing/Rough-in9/10/20049/13/20049/13/2004 12:00:00 AMPPASS
after 2 pm
BLD04-01268 BLD-Wall cover9/13/20049/13/20049/13/2004 12:00:00 AMPPASS
ZACK; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok to cover 9/13/2004 3:37:34 PM
MIS04-00253 BLD-Conference9/13/20049/13/20049/13/2004 12:00:00 AMPPASS
Jim, this is the complaint......."Building a shed on the property line that is 8' wide 10 - 12 ' long. They are forming it on railroad ties not a pre-fab, has no roof. Also the subdivision pier point, has an easment agreement???" Patrick McIntire would like you to call him about this complaint he can be reached at ###-#### or ###-#### under 200sq ft 9/13/2004 1:24:54 PM
BLD04-00435 BLD-Energy code compliance9/13/20049/13/20049/13/2004 12:00:00 AMPPASS