FIR03-00690
| INSP-Final Inspection | 8/31/2004 | 9/13/2004 | 9/13/2004 12:00:00 AM | A | FAIL |
|
|
###-#### - cliff Need correct sized batteries for panel on 6th floor; need breaker location on all panels and lockout on breaker; point 45 not used as FACP area has two detectors in area; need descriptors for "modules" to indicate location; remote annunciator not installed permanently in front desk area; tested devices in hallways/closets on 2-6 floors; need to test kitchen hood; sprinkler devices, heat detectors in laundry, drops on NAC's as 14 gauge wire is used, penthouse pre-action troubles/alarm, duct detectors, and sounder base devices in rooms and notification in all areas 9/13/2004 11:46:31 AM
|
FIR04-00237
| INSP-Sprinkler Rough-in | 9/10/2004 | 9/13/2004 | 9/13/2004 12:00:00 AM | A | PART |
|
|
Contact: Chris - Would like at 8 am - Please call to confirm; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Okay to cover; the 2inch main was modified to get around the duct work; head not installed at beam/ductwork in SW corner 9/13/2004 11:35:48 AM
|
FIR04-00491
| INSP-Final Inspection | 9/13/2004 | 9/13/2004 | 9/13/2004 12:00:00 AM | P | PASS |
|
|
contact: Matt - call to confirm time to meet; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley
|