ELE10-01792
| Final | 9/13/2010 | 9/13/2010 | 9/13/2010 3:32:58 PM | P | PASS |
|
|
Rocky Phone #: ###-#### ok final
|
ELE10-01998
| Conference | 9/13/2010 | 9/13/2010 | 9/13/2010 2:11:16 PM | A | DONE |
|
|
Call to arrange time at my office to verify installation. Phone #: ###-#### >> Inspection requested via web by Therrin Robertson talked about termination for generator connectors, grounding, enclosure size
|
ELE10-01997
| Conference | 9/10/2010 | 9/13/2010 | 9/13/2010 1:04:36 PM | A | DONE |
|
|
Would like to meet on the job after 10 am Phone #: ###-#### >> Inspection requested via web by Alan Lusk talked about service and rewire dwelling, modifying existing raceways to use non-metallic flex, outlet spacing
|
GCE10-00103
| GCE-Final | 9/10/2010 | 9/13/2010 | 9/13/2010 11:37:31 AM | A | PASS |
|
|
Scope: FinalContact: Buck @ ###-####Call in advance please ok final
|
GCE10-00063
| GCE-Rough-In | 9/10/2010 | 9/13/2010 | 9/13/2010 10:21:37 AM | A | PASS |
|
|
Scope: Rough-In (Ceiling Cover)Contact: Kelly @ ###-#### hard lids only ok cover
|
GCE09-00045
| GCE-Final | 9/10/2010 | 9/13/2010 | 9/13/2010 9:32:30 AM | A | PASS |
|
|
Scope: FinalContact: Mike @ ###-#### corrections made, ok to final
|
ELE10-01996
| Conference | 9/10/2010 | 9/13/2010 | 9/13/2010 8:48:21 AM | A | DONE |
|
|
Paul Phone #: ###-#### talked about wring remote building, check for u/g,
|
ELE10-01731
| Final | 9/10/2010 | 9/13/2010 | 9/13/2010 8:25:51 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Tate ok final, signed card
|