Inspections for the day of: Monday, September 13, 2010.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD10-00924 FIRE-Final Inspection9/10/20109/13/20109/13/2010 3:29:46 PMPFAIL
Provide panic hardware at three locations, post signage at the door to the FACP room, post one fire extinguisher at the basement mechanical room per review notes, remove one non-functional SD at the west stairway, provide approved plan mod reflecting the scope of work not including the new addition incomplete at this time. Project finishes underway.
FIR10-00338 INSP-Final Inspection9/13/20109/13/20109/13/2010 3:24:54 PMPPART
Final pending control valve supervision at the spray booth.
FIR10-00401 INSP-Final Inspection9/10/20109/13/20109/13/2010 3:23:40 PMPPASS
Fire alarm work passed inspection, permit final approved.
BLD10-01600 FIRE-Final Inspection9/10/20109/13/20109/13/2010 3:22:51 PMAPASS
Correction notice items verified for completion. Life safety finaled.
BLD10-00664 FIRE-Final Inspection9/10/20109/13/20109/13/2010 3:21:44 PMAPASS
Final fire life safety inspection completed acceptable, two missing escutcheons at the metrology lab to be replaced as discussed.
BLD10-02162 FIRE-Final Inspection9/10/20109/13/20109/13/2010 3:20:04 PMPPASS
Noted corrections including power at one EM light and one exit sign, door hardware and posted fire extinguishers are complete. Life safety inspection passed.