BLD11-01568
| FIRE-Final Inspection | 9/13/2011 | 9/13/2011 | 9/13/2011 5:02:18 PM | P | PART |
|
|
Project related fire sprinkler permit final okay, fire life safety final pending adjustments to the fire alarm system.
|
BLD11-00416
| FIRE-Conference | 9/13/2011 | 9/13/2011 | 9/13/2011 4:58:06 PM | P | DONE |
|
|
Regarding fire alarm manual pull station locations.
|
BLD10-02330
| FIRE-Final Inspection | 9/13/2011 | 9/13/2011 | 9/13/2011 4:56:53 PM | P | PASS |
|
|
Fire life safety completed satisfactory.
|
BLD10-02862
| FIRE-Alarm Testing | 9/13/2011 | 9/13/2011 | 9/13/2011 4:53:10 PM | P | PART |
|
|
Fire alarm work passed field testing.
|
BLD11-02077
| FIRE-Final Inspection | 9/12/2011 | 9/13/2011 | 9/13/2011 1:19:58 PM | P | PASS |
|
|
Correction items per T. Cobbley verified for completion.
|
BLD11-01935
| FIRE-Final Inspection | 9/12/2011 | 9/13/2011 | 9/13/2011 12:55:20 PM | A | PASS |
|
|
Life safety pass pending approved hardware at the exterior vestibule door to be completed by building owner. Latch at the door knob from the tenant space disabled. Remainder of C/N items finished.
|
FIR11-00267
| INSP-Final Inspection | 9/12/2011 | 9/13/2011 | 9/13/2011 12:50:58 PM | A | PASS |
|
|
Field verified repair of one notification device at the 1st floor elevator lobby. Fire alarm permit final approved.
|
BLD11-01915
| FIRE-Final Inspection | 9/13/2011 | 9/13/2011 | 9/13/2011 12:43:53 PM | P | PASS |
|
|
Fire life safety inspection passed.
|
BLD11-00689
| FIRE-Final Inspection | 9/12/2011 | 9/13/2011 | 9/13/2011 12:43:06 PM | A | PASS |
|
|
C/N item verified for completion. Life safety finaled.
|