FIR13-00350
| INSP-Supply line flush | 9/5/2013 | 9/6/2013 | | P | |
|
|
Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
FIR13-00348
| INSP-Supply line flush | 9/5/2013 | 9/6/2013 | | P | |
|
|
Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
FIR13-00482
| INSP-Sprinkler Rough-in | 9/12/2013 | 9/13/2013 | 9/16/2013 5:11:49 PM | P | PART |
|
|
Final pending repair work at the east side dry system. Scope of permit work is complete.
|
BLD13-01927
| FIRE-Final Inspection | 9/12/2013 | 9/13/2013 | 9/16/2013 5:10:27 PM | A | FAIL |
|
|
East side fire sprinkler system is not yet in service, fire alarm permit work underway, provide approved hardware at the new warehouse exit door. Project is not yet in condition for final occupancy approval at this time.
|
FIR13-00494
| INSP-Final Inspection | 9/13/2013 | 9/13/2013 | 9/16/2013 5:02:40 PM | P | PART |
|
|
Okay to cover overhead work. Final pending construction of new soffit and ceiling tile/escutcheons.
|
FIR13-00288
| INSP-Sprinkler Rough-in | 9/13/2013 | 9/13/2013 | 9/16/2013 4:55:51 PM | P | PART |
|
|
Okay to cover fire sprinkler work at the remainder of grid ceilings in the remodel area (phase 2).
|
FIR13-00367
| INSP-Sprinkler Rough-in | 9/12/2013 | 9/13/2013 | 9/16/2013 4:49:40 PM | A | PART |
|
|
Inspection for cover completed at the grid ceiling areas- noted two overspaced heads in need of relocation- one at the SE corridor and one adjacent to the west side sheetrock soffit.
|
BLD13-02193
| FIRE-Final Inspection | 9/12/2013 | 9/13/2013 | 9/16/2013 2:13:28 PM | P | PASS |
|
|
Fire life safety inspection completed satisfactory.
|
FIR13-00424
| INSP-Final Inspection | 9/13/2013 | 9/13/2013 | 9/16/2013 7:41:29 AM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR13-00266
| INSP-Sprinkler Rough-in | 9/12/2013 | 9/13/2013 | 9/13/2013 11:21:37 AM | A | PART |
|
|
Remainder of C/N items verified for completion. System two trip tested at 1 min. 6 seconds. System one trip tested at 2 min 15 sec. and will require the addition of a QOD. Quick trip of the new dry valve passed.
|
FIR13-00451
| INSP-Final Inspection | 9/12/2013 | 9/13/2013 | 9/13/2013 11:16:48 AM | A | PASS |
|
|
Fire alarm work passed functional testing and inspection. Permit final approved.
|
FIR13-00490
| INSP-Sprinkler Rough-in | 9/12/2013 | 9/13/2013 | 9/13/2013 11:15:13 AM | A | PART |
|
|
Overhead rough-in and modifications to the system at the tenant remodel area okayed for cover.
|
FIR13-00367
| INSP-Final Inspection | 9/12/2013 | 9/13/2013 | 9/12/2013 9:49:03 AM | A | CANC |
|
|
Please call Colton 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|