FIR13-00439
| INSP-Sprinkler Rough-in | 9/13/2013 | 9/13/2013 | 9/13/2013 3:39:24 PM | P | PASS |
|
|
Underground supply piping is ok to cover.
|
FIR13-00493
| INSP-Sprinkler Rough-in | 9/13/2013 | 9/13/2013 | 9/13/2013 3:28:33 PM | P | PASS |
|
|
Sprinkler piping is ok to cover.
|
FIR13-00385
| INSP-Final Inspection | 9/11/2013 | 9/13/2013 | 9/13/2013 3:17:04 PM | A | FAIL |
|
|
Ceiling tile is missing.
|
FIR13-00344
| INSP-Supply line flush | 9/12/2013 | 9/13/2013 | 9/13/2013 2:31:52 PM | A | CANC |
|
|
United Water still has not turned on the underground supply water
|
BLD13-00948
| FIRE-Final Inspection | 9/13/2013 | 9/13/2013 | 9/13/2013 2:18:21 PM | P | PART |
|
|
A temporary occupancy is being given with Romeo's permission until the patio lighting and exit discharge lighting has been installed and tested. Patio not to be used until the lighting has been installed. Dave is going to cover the outstanding door hardware issues.
|
FIR13-00344
| INSP-Sprinkler Rough-in/Hydro | 9/12/2013 | 9/13/2013 | 9/13/2013 1:34:47 PM | A | PASS |
|
|
The overhead hydro for both floors passed
|
BLD13-01834
| FIRE-Final Inspection | 9/12/2013 | 9/13/2013 | 9/13/2013 11:56:19 AM | A | PASS |
|
|
life safety passed
|
FIR13-00446
| INSP-Final Inspection | 9/12/2013 | 9/13/2013 | 9/13/2013 10:06:11 AM | A | PASS |
|
|
permit finaled
|
FIR13-00314
| INSP-Final Inspection | 9/12/2013 | 9/13/2013 | 9/13/2013 10:04:35 AM | A | PASS |
|
|
Permit finaled
|
FIR13-00487
| INSP-Final Inspection | 9/12/2013 | 9/13/2013 | 9/13/2013 9:59:30 AM | A | PASS |
|
|
Correction made. Permit finaled.
|
BLD13-00948
| FIRE-Final Inspection | 9/12/2013 | 9/13/2013 | 9/13/2013 9:57:21 AM | A | FAIL |
|
|
Provide panic hardware on the designated doors and provide single action hardware on the exit to lobby door and the mezzanine office door. Provide second exit/gate from teh Patio seating area. Provide emergency lighting for the Patio area and exit discharge lighting for all of the other required exits. Install the missing sprinkler canopies.
|