MIS16-00293
| BLD-Final | 9/13/2016 | 9/13/2016 | 9/14/2016 10:00:08 AM | A | CANC |
|
|
re-roof w/o permit
|
BLD16-03360
| BLD-Final | 9/13/2016 | 9/13/2016 | 9/13/2016 2:47:27 PM | P | PASS |
|
|
Todd Phone #: ###-####
|
BLD16-00731
| BLD-Framing/Rough-in | 9/13/2016 | 9/13/2016 | 9/13/2016 2:34:09 PM | P | PART |
|
|
Pat Phone #: ###-####// inspection for units 104, 105, and 106
|
BLD16-01293
| BLD-Final | 9/13/2016 | 9/13/2016 | 9/13/2016 2:33:29 PM | P | CANC |
|
|
|
MIS16-00293
| DOC - Permit Finaled | 9/13/2016 | 9/13/2016 | 9/13/2016 2:12:47 PM | P | PASS |
|
|
|
BLD15-03333
| BLD-Final | 9/13/2016 | 9/13/2016 | 9/13/2016 2:12:30 PM | P | NR |
|
|
Tom Phone #: ###-#### Need Electrical final prior to calling for structural final.
|
BLD16-00085
| BLD-Framing/Rough-in | 9/12/2016 | 9/13/2016 | 9/13/2016 12:22:55 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Paul Fedorchuk
|
BLD16-02561
| BLD-Framing/Rough-in | 9/12/2016 | 9/13/2016 | 9/13/2016 12:22:36 PM | A | PART |
|
|
Matt Phone #: ###-#### C/N posted .....Insp will check at energy inspection.
|
BLD16-02561
| BLD-Wall Bracing | 9/12/2016 | 9/13/2016 | 9/13/2016 12:21:28 PM | A | PASS |
|
|
Matt Phone #: ###-####
|
BLD16-02922
| BLD-Footing | 9/12/2016 | 9/13/2016 | 9/13/2016 11:05:27 AM | A | PASS |
|
|
Footing inspection can be done at anytime Tuesday morning. Alex will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
BLD16-02808
| BLD-Footing | 9/12/2016 | 9/13/2016 | 9/13/2016 10:43:11 AM | A | PART |
|
|
charles Phone #: ###-#### Footing and wall of trash enclosure OK pending MTI inspection, tests and approvals OK to cover paraput wall
|
BLD16-01493
| BLD-Final | 9/13/2016 | 9/13/2016 | 9/13/2016 12:00:00 AM | P | CANC |
|
|
Brett Phone #: ###-####
|