MIS16-00234
| MEC-Conference | 9/13/2016 | 9/13/2016 | 9/13/2016 4:48:51 PM | P | DONE |
|
|
Went and met Dewaine with the boise fire department on site today. We went inside and found that the coffee roaster has been removed from the premises
|
MEC16-04113
| Pressure Test | 9/13/2016 | 9/13/2016 | 9/13/2016 4:28:40 PM | P | PASS |
|
|
Kirk Phone #: ###-#### - 5lb flue
|
MEC16-04113
| Final | 9/13/2016 | 9/13/2016 | 9/13/2016 4:28:23 PM | P | PASS |
|
|
Kirk Phone #: ###-####
|
MEC16-04093
| Final | 9/12/2016 | 9/13/2016 | 9/13/2016 3:27:23 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Marisa Hone
|
MEC15-02759
| Rough-in | 9/12/2016 | 9/13/2016 | 9/13/2016 2:47:14 PM | P | PART |
|
|
GBAD rough-in cover: 1st floor lobby ; vestibule. Onsite contact: Jim Brown. Phone #: ###-#### Inspection requested via web by Melissa Kaae - okay to cover hard lid portion of 1st floor lobby gbad side
|
MEC16-01213
| Rough-in | 9/13/2016 | 9/13/2016 | 9/13/2016 2:46:18 PM | P | PART |
|
|
Ballroom 2nd floor lobby approve fro cover. Phone #: ###-#### Inspection requested via web by Crystal Grant - okay to cover ceiling grid in elevator lobby on 2nd floor
|
MEC16-03476
| Conference | 9/13/2016 | 9/13/2016 | 9/13/2016 2:26:41 PM | P | DONE |
|
|
1:30 - meet with Eric and the plumber to discuss materials in the plenum
|
MEC16-04068
| Final | 9/12/2016 | 9/13/2016 | 9/13/2016 11:23:00 AM | A | FAIL |
|
|
Please call Joe at ###-#### about 30 - 60 minutes prior to inspection so he get to house. It is his daughter''s place. Phone #: ###-#### Inspection requested via web by Mary LaFayette - need electrical service switch at furnace
|
MEC15-02759
| Conference | 9/13/2016 | 9/13/2016 | 9/13/2016 11:03:30 AM | P | CANC |
|
|
1:30
|
MEC16-03376
| Rough-in | 9/9/2016 | 9/13/2016 | 9/13/2016 10:11:18 AM | A | PART |
|
|
Grease duct 1st layer grease wrap inspection 1st Floor, requesting to be first inspection of the day if possible, thanks. Please contact Jim Brown. Phone #: ###-#### Inspection requested via web by Melissa Kaae - 1st layer of fire wrap okay
|
MEC16-00153
| Pressure Test | 9/12/2016 | 9/13/2016 | 9/13/2016 10:10:22 AM | A | PASS |
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - 100lb hydronic pass for whole system
|
MEC16-04105
| Pressure Test | 9/12/2016 | 9/13/2016 | 9/13/2016 9:10:01 AM | A | PASS |
|
|
BACK YARD IS OPEN Phone #: ###-#### Inspection requested via web by Gary Reeves - 20lb gas pass
|
MEC15-03566
| Mec-Aging Inspection | 9/13/2016 | 9/13/2016 | 9/13/2016 7:03:04 AM | | CANC |
|
|
|
MEC16-00262
| Mec-Aging Inspection | 9/13/2016 | 9/13/2016 | 9/13/2016 7:01:27 AM | | CANC |
|
|
WIP
|