ELE17-00839
| Final | 9/12/2017 | 9/13/2017 | 9/13/2017 2:19:44 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Need area of classification for storage of hops, fan is in place just need verification
|
ELE17-02997
| Permanent Service | 9/11/2017 | 9/13/2017 | 9/13/2017 1:29:50 PM | P | PASS |
|
|
This is a service change so if I could get an inspection around 2 pm that would be great so that we can get reconnected. Phone #: ###-#### Inspection requested via web by Mark Morgan p/s o/h rec ok
|
ELE16-01134
| Conference | 9/12/2017 | 9/13/2017 | 9/13/2017 1:29:29 PM | P | DONE |
|
|
We are requesting a conference at the hotel for tomorrow afternoon. Our contact for this is Justin Kerr @ ###-####. Thank you Phone #: ###-#### Inspection requested via web by Clint Tate Conference done by phone for whats needed for final
|
ELE17-02999
| Conference | 9/11/2017 | 9/13/2017 | 9/13/2017 10:03:52 AM | A | CANC |
|
|
Talk with Darrell Will call homeowner and he will figured out a new game plan
|
ELE17-03020
| Electrical Rough-In | 9/12/2017 | 9/13/2017 | 9/13/2017 9:35:42 AM | A | PASS |
|
|
I would like to meet you there can you give me hour notice? Phone #: ###-#### Inspection requested via web by Neal Rumsey Light pole install ok, GC stated all conduit and cage was looked at by public works
|
ELE17-03020
| Final | 9/13/2017 | 9/13/2017 | 9/13/2017 9:35:28 AM | P | PASS |
|
|
I would like to meet you there can you give me hour notice? Phone #: ###-#### Inspection requested via web by Neal Rumsey Final for street light ok
|
ELE17-02159
| Final | 9/12/2017 | 9/13/2017 | 9/13/2017 8:27:15 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Lee VanSchoiack Corrections for poool issues fixed Final ok No card on site to sign
|
ELE17-02159
| Electrical Rough-In | 9/12/2017 | 9/13/2017 | 9/13/2017 8:26:35 AM | A | PASS |
|
|
E grid Phone #: ###-#### Inspection requested via web by Lee VanSchoiack E/Q potential around pool perimeter ok cover
|