ELE18-03253
| Rough-In Permanent Service | 9/12/2018 | 9/13/2018 | 9/13/2018 3:51:33 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Wren Van Bockel Shed to remain unfinished, Owner dedicated 20 amp circuits to each receptacle location, (20) receptacles. Service- need to move load conduit to right side of meter , Idaho Power needs far left knock out for service lateral chase to meter base of enclosure. Grounding electrode conductor to remain connected. p/s u/g n ok
|
ELE18-02598
| Final | 9/13/2018 | 9/13/2018 | 9/13/2018 2:53:36 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk Final ok
|
ELE18-03088
| Final | 9/13/2018 | 9/13/2018 | 9/13/2018 2:16:40 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Requested by mistake
|
ELE18-03320
| Electrical Rough-In | 9/13/2018 | 9/13/2018 | 9/13/2018 1:58:11 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Level 3 interior wall rough in ok cover
|
ELE18-02489
| Electrical Rough-In | 9/13/2018 | 9/13/2018 | 9/13/2018 1:57:28 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Level 1 bathroom hardlids rough in ok cover
|
ELE18-01651
| Final | 9/12/2018 | 9/13/2018 | 9/13/2018 1:11:01 PM | A | NH |
|
|
Please call Kevin ###-#### to meet you there. If you have any questions please feel free to contact Luke ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Called contact and he asked to cancel and he would contact electrical contractor and reschedule.
|
ELE18-02296
| Final | 9/12/2018 | 9/13/2018 | 9/13/2018 1:08:08 PM | A | PASS |
|
|
Check Panel room for clear, as well as floor power in conference room. Phone #: ###-#### Inspection requested via web by Devan Hardwick Final ok
|
ELE18-02081
| Final | 9/12/2018 | 9/13/2018 | 9/13/2018 11:32:01 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ben Archibald Generator not set at time of inspection. Final ok
|
ELE18-03486
| Temporary Service | 9/12/2018 | 9/13/2018 | 9/13/2018 11:04:06 AM | A | PASS |
|
|
call with any questions thank you Phone #: ###-#### Inspection requested via web by kim grundhauser t/s u/g n ok
|
ELE18-02559
| Electrical Rough-In | 9/12/2018 | 9/13/2018 | 9/13/2018 10:35:55 AM | A | PASS |
|
|
Please call Toby for wall R/I inspection on B36 renovation.
Thanks! Phone #: ###-#### Inspection requested via web by Rafael Office 104 and storage 104(A) wall rough in ok cover.
|
ELE18-01206
| Electrical Rough-In | 9/13/2018 | 9/13/2018 | 9/13/2018 10:34:10 AM | P | PASS |
|
|
###-#### North side area A-B wall rough in ok cover
|