ELE15-00888
| Final | 9/13/2018 | 9/13/2018 | 9/13/2018 3:10:56 PM | P | PASS |
|
|
Converted garage into a music studio. Call Jimmy for questions. Phone #: ###-#### Inspection requested via web by John Edwards Final ok
|
ELE18-03506
| Final | 9/12/2018 | 9/13/2018 | 9/13/2018 2:54:41 PM | P | PASS |
|
|
Please call ahead first so I can meet you there and let you in. Thanks Mark Phone #: ###-#### Inspection requested via web by Mark Morgan Final for hot tub ok
|
ELE18-03050
| Final | 9/13/2018 | 9/13/2018 | 9/13/2018 1:41:46 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jonathan Stewart Bath final ok
|
ELE18-03148
| Electrical Rough-In | 9/13/2018 | 9/13/2018 | 9/13/2018 1:41:31 PM | P | PASS |
|
|
Men’s bathroom rough in inspection. Crew is currently moving handrail locations and should have it done by lunchtime. Journeyman will be on site call if you’re having access issues. Phone #: ###-#### Inspection requested via web by Garrett Collins Mens bathroom ok to cover
|
ELE18-01718
| Electrical Rough-In | 9/13/2018 | 9/13/2018 | 9/13/2018 1:41:08 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kyle Lott Hard lids and bathroom ceiling ok to cover
|
ELE18-03233
| Final | 9/12/2018 | 9/13/2018 | 9/13/2018 12:35:16 PM | A | PART |
|
|
solar addition to existing system is complete, according to plans, and ready for inspection. Approved plans on site, located at the meter. Give the customer a call a head of time for access to the basement. Other than that, it''s a easy one; Enphase micro inverter system. Give me a call if you have any questions at all. Thanks guys, Ryan King Phone #: ###-#### Inspection requested via web by Ryan King Final ok for solar array system
|
ELE18-03271
| Electrical Rough-In | 9/12/2018 | 9/13/2018 | 9/13/2018 10:43:13 AM | A | PASS |
|
|
John. Underground pole base ; drive thru bases. Phone #: ###-#### Inspection requested via web by Sean DeLacy U/G for parking lot and ordering board and secondarys ok to cover
|
ELE18-02502
| Final | 9/12/2018 | 9/13/2018 | 9/13/2018 9:47:42 AM | A | PART |
|
|
(tamper rec installed) Phone #: ###-#### Inspection requested via web by Brandon Winters Need to Move GFCI for water fountain to panel and lockout for water heater Signed Temp occ
|
ELE18-03108
| Electrical Rough-In | 9/12/2018 | 9/13/2018 | 9/13/2018 9:16:38 AM | A | PASS |
|
|
u/g first thing if possible U/G for pool lights and power only ok to cover
|