Inspections for the day of: Friday, September 13, 2019.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-01529 Final9/6/20199/13/20199/13/2019 3:05:01 PMPPASS
I am working on Friday but will be home after 3:00 PM Have worked out with Tom to meet Phone #: ###-#### Inspection requested via web by Ron MacCulloch....ok to final
ELE18-03803 Electrical Rough-In9/9/20199/13/20199/13/2019 2:32:23 PMPPASS
late pm // Russell Phone #: ###-####...
heated tile floor ok to cover
ELE19-03029 Final9/13/20199/13/20199/13/2019 2:10:49 PMPPASS
Please call when you are in route. Phone #: ###-#### Inspection requested via web by Spencer McLean....
rigid cinduit verified for feed
disconnect labelled, breakers installed, and wiring sized correctly
discussed with contractor that equipment is hard wired and GFCI protection not needed-no recp
ELE19-03468 Final9/13/20199/13/20199/13/2019 12:13:50 PMPPASS
Ronald Smith Phone #: ###-#### Inspection requested via web by Dave Brueggemann....
permit for tile floor....electrical contractor taking responsibility for tile heat installed without rough in inspection...circuits holds and GFCI protection verified...ok to final
ELE19-02465 Final9/13/20199/13/20199/13/2019 12:11:35 PMPPASS
final permit...work complete of permit...permit for other work pulled...ok to final
MIS19-00293 ELE-Final9/13/20199/13/20199/13/2019 11:47:06 AMPPASS
ok to final
permit pulled for heated tile floor..ELE19-03468
ELE19-03461 Temporary Service9/13/20199/13/20199/13/2019 11:34:33 AMPPASS
oh temp pole Phone #: ###-#### Inspection requested via web by Richard Gratiot...
t/s o/h new ok
ELE19-03316 Electrical Rough-In9/11/20199/13/20199/13/2019 10:52:46 AMAPASS
We will be starting the install in the morning, so if you could do rough inspection late morning, we will be further along in the install. Phone #: ###-#### Inspection requested via web by Ashley Lanham...
UL listing verified on material

discussed scope of job with onsite journeyman..will be backfeeding from subpanel-electrician will do load calc on subpanel for house, verify sub feed SER is rated to carry 125% of load, and electrician is required to be at FINAL to verify information.
ELE19-03433 Electrical Rough-In9/12/20199/13/20199/13/2019 10:15:15 AMAPASS
Phone #: ###-#### Inspection requested via web by Patrick Paz...rough ok to cover
ELE19-02285 Final9/11/20199/13/20199/13/2019 9:46:01 AMAPASS
Phone #: ###-#### Inspection requested via web by Barbara Szurgot...ok to final
ELE19-02006 Electrical Rough-In9/12/20199/13/20199/13/2019 9:16:43 AMAPASS
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...
front desk reception outlets and LV...access to junction boxes in wall at first 2 desks shall be accessible-verify at final...ok to cover
ELE19-03457 Rough-In Permanent Service9/12/20199/13/20199/13/2019 8:45:13 AMAPASS
Please contact when done Phone #: ###-#### Inspection requested via web by Thomas wilson...p/s u/g new ok
ELE17-03213 DOC - Permit Expired9/13/20199/13/20199/13/2019 8:31:02 AMAPASS
no work done...verified
no activity in 180 days
ELE19-00955 Final9/13/20199/13/20199/13/2019 8:16:12 AMAPASS
We thought this final inspection was to be completed at the same time of the permanent service inspection as we were done with the project

Gate Code 1223 Any issues gaining access - call ###-#### Phone #: ###-#### Inspection requested via web by JENNY EMEL...

service shall have meter installed before final can be given

job complete...meter installed...ok to final
ELE17-01002 ELE-Request for Extension9/13/20199/13/20199/13/2019 7:28:43 AMAPASS
still under construction
ELE17-01002 ELE-Aging Inspection9/13/20199/13/20199/13/2019 7:28:16 AM PASS
permit extended