Inspections for the day of: Monday, September 14, 1998.
Number of inspections: 27
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC98-02960 INSP - Final9/14/19989/14/19989/15/1998 12:00:00 AMPFAIL
09/14/98 407 - these units have not been framed in and will not be inspe
MEC98-02960 INSP - Final9/14/19989/14/19989/15/1998 12:00:00 AMPFAIL
09/14/98 407 - these units have not been framed in and will not be inspe
MEC98-02961 INSP - Final9/14/19989/14/19989/15/1998 12:00:00 AMPFAIL
/ / 407 - these units have not been framed in and will not be inspecte 866-ying out the crawl space now,I have talked with Stan from Stetson.
MEC98-02961 INSP - Final9/14/19989/14/19989/15/1998 12:00:00 AMPFAIL
/ / 407 - these units have not been framed in and will not be inspecte 866-ying out the crawl space now,I have talked with Stan from Stetson.
BLD96-01058 INSP - Letter of compliance9/14/19989/14/19989/14/1998 12:00:00 AM PASS
/ / 407 - LC#15937
BLD96-01058 INSP - Final9/14/19989/14/19989/14/1998 12:00:00 AM PASS
/ / 407 -
BLD96-01058 INSP - Letter of compliance9/14/19989/14/19989/14/1998 12:00:00 AM PASS
/ / 407 - LC#15937
MEC98-01232 INSP - Framing/ Rough-in9/11/19989/14/19989/14/1998 12:00:00 AMAPASS
09/14/98 407 - Scheduled by Hello!. Contact phone is [3362665].
MEC98-02760 INSP - Framing/ Rough-in9/11/19989/14/19989/14/1998 12:00:00 AMAFAIL
09/14/98 407 - gas test failed.
BLD96-00002 INSP - Wall cover9/10/19989/14/19989/14/1998 12:00:00 AMACANC
09/14/98 407 - trans to 301
MEC98-01882 INSP - Final9/11/19989/14/19989/14/1998 12:00:00 AMAPASS
09/14/98 407 - Scheduled by Hello!. Contact phone is [3362665].
MEC98-01882 INSP - Final9/11/19989/14/19989/14/1998 12:00:00 AMAPASS
09/14/98 407 - Scheduled by Hello!. Contact phone is [3362665].
BLD98-01598 INSP - Final9/8/19989/14/19989/14/1998 12:00:00 AMANR
09/14/98 407 - need plumbing and electrical final.
BLD98-01606 INSP - Framing/Rough-in9/11/19989/14/19989/14/1998 12:00:00 AMAFAIL
09/14/98 407 - left corrections.o!.
BLD98-01606 INSP - Framing/Rough-in9/11/19989/14/19989/14/1998 12:00:00 AMAFAIL
09/14/98 407 - still has corrections.
BLD98-01828 INSP - Framing/Rough-in9/11/19989/14/19989/14/1998 12:00:00 AMAFAIL
09/14/98 407 - left corrections.o!. Contact phone is [4241366].
BLD98-02336 INSP - Foundation9/11/19989/14/19989/14/1998 12:00:00 AMANR
09/14/98 407 - not ready job not complete.
BLD98-02454 INSP - Foundation9/14/19989/14/19989/14/1998 12:00:00 AMPPASS
09/14/98 407 - BOB EASON ###-#### FOR FT INSP
BLD98-02549 INSP - Foundation9/14/19989/14/19989/14/1998 12:00:00 AMPPASS
09/14/98 407 - BOB ###-#### FOR FT INSP
BLD98-02551 INSP - Foundation9/14/19989/14/19989/14/1998 12:00:00 AMPCANC
09/14/98 407 - trans to 301.RE-INSP FOR FT
BLD98-01648 INSP - Energy code compliance9/14/19989/14/19989/14/1998 12:00:00 AMPPASS
09/14/98 407 - DAVID ###-####
MEC98-02581 INSP - Final9/11/19989/14/19989/14/1998 12:00:00 AMPFAIL
09/14/98 407 - left correction.lo!. Contact phone is [3712053].
MEC98-02581 INSP - Final9/11/19989/14/19989/14/1998 12:00:00 AMPFAIL
09/14/98 407 - left correction.lo!. Contact phone is [3712053].
MEC98-02963 INSP - Final9/14/19989/14/19989/14/1998 12:00:00 AMPPASS
09/14/98 407 - gas plog fp.
MEC98-02963 INSP - Final9/14/19989/14/19989/14/1998 12:00:00 AMPPASS
09/14/98 407 - gas plog fp.
BLD98-00836 INSP - Framing/Rough-in9/14/19989/14/19989/14/1998 12:00:00 AMPFAIL
09/14/98 407 - left corrections. CEILING GRID
MEC98-01882 INSP - Framing/ Rough-in9/11/19989/14/19989/11/1998 12:00:00 AMACANC
Scheduled by Hello!. Contact phone is [3362665]. Cancelled by Hello! (Last update by [HLO]). Contact: [3362665].