ELE00-03574
| Temporary Service | 9/13/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | PASS |
|
|
per marv for t/p insp
|
ELE00-03581
| Electrical Rough-In | 9/13/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | PASS |
|
|
FOR CONF--###-####-CELL- JOHN ok 9/14/2000 12:18:04 PM
|
ELE00-01803
| Final | 9/13/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/13/2000 at 16:56:49. Contact: ###-####. ok 9/14/2000 12:17:52 PM
|
ELE00-01611
| Final | 9/13/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/13/2000 at 23:02:23. Contact: ###-####. needs clearence closet lights, for panel, and required out master bath 9/14/2000 12:19:17 PM
|
ELE00-03450
| Permanent Service | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | P | PASS |
|
|
reinspection ###-#### p/s o/h rec.ok
9/14/2000 4:38:41 PM
|
ELE00-03108
| Electrical Rough-In | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/14/2000 at 09:01:34. Contact: ###-####. Inspector t grid in the main room for cover cor. posted ceiling covered before inspection 9/14/2000 4:39:50 PM
|
ELE00-03588
| Electrical Rough-In | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/14/2000 at 09:57:59. Contact: ###-####. walls ok 9/14/2000 4:38:59 PM
|
ELE00-03600
| Final | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | P | NH |
|
|
MIKE-- ###-#### HOT TUB notice posted 9/14/2000 4:38:09 PM
|