PLM00-02700
| Final | 9/13/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/13/2000 at 12:11:28. Contact: ###-####.
|
PLM00-03253
| Plumbing Rough-in | 9/13/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | PART |
|
|
r/i rob ###-#### part ri ok sewer not tied in in the crawl space 9/14/2000 3:27:39 PM
|
PLM00-02706
| Final | 9/13/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM00-01433
| Final | 9/13/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | FAIL |
|
|
Chad ###-#### pipe t&p drain to exterior and turn down 9/14/2000 1:22:13 PM
|
PLM00-03254
| Plumbing Rough-in | 9/13/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | PASS |
|
|
Craig ###-####
|
PLM00-03252
| Water and/or Sewer | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | PART |
|
|
Added by Inspector: 330 On 9/14/2000 sewer and water covered with parks dept approval, i had them expose connection to sewer stub it looked ok, wright brothers const will supply me wiyh photos of installation for our review if not satisfied they will re-excavate.
|
PLM00-03236
| Plumbing Rough-in | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | P | PASS |
|
|
rob ###-####
|
PLM00-01896
| Final | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/14/2000 at 09:44:17. Contact: ###-####. test premis rp, set x-ray equipment, temp occ ok 9/14/2000 2:30:54 PM
|
PLM00-03258
| Plumbing Rough-in | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/14/2000 at 10:22:27. Contact: ###-####.
|
PLM00-01433
| Final | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 330 On 9/14/2000
|
PLM00-03252
| Water and/or Sewer | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 9/14/2000 water connection reispection. ok, i got the pictures of the sewer being installed, none of the water service, i have seen both ends and they 9/14/2000 3:07:55 PM seem ok as far as depth and bedding. 9/14/2000 3:08:16 PM
|
PLM00-02850
| Plumbing Rough-in | 9/12/2000 | 9/14/2000 | 9/13/2000 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 09/12/2000 at 10:11:06. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/13/2000 at 12:31:47.
|