ELE00-03603
| Electrical Rough-In | 9/14/2000 | 9/14/2000 | 9/15/2000 12:00:00 AM | A | PASS |
|
|
conference Kelly ###-####. discussed branch circuits code requirements. 9/15/2000 12:53:35 PM
|
ELE00-00149
| Final | 9/13/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | PART |
|
|
LYLE PAGER ###-#### FN. main service panel/pedistal for historical lighting. 9/14/2000 12:44:20 PM
|
ELE00-03578
| Electrical Rough-In | 9/13/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | PASS |
|
|
JIM ###-#### R/I . offices; walls ele r/i. 9/14/2000 12:45:06 PM
|
ELE00-03254
| Final | 9/13/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/13/2000 at 16:14:37. Contact: ###-####. completed. 9/14/2000 12:46:18 PM
|
ELE00-03566
| Electrical Rough-In | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/14/2000 at 06:06:03. Contact: ###-####. 2-bathrooms remodel, ele r/i. 9/14/2000 12:45:53 PM
|
ELE00-03455
| Permanent Service | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | P | PART |
|
|
Joe ###-####. conference; service entrance conductors considered outside of building. 9/14/2000 7:56:16 PM
|
ELE00-03054
| Electrical Rough-In | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | P | PART |
|
|
R/I --SID ###-#### . breakroom; bathrooms, and vault in southwest area ele r/i. 9/14/2000 7:53:32 PM
|
ELE99-01707
| Electrical Rough-In | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/14/2000 at 09:27:42. Contact: ###-####. exercise room ceiling ele r/i, southwest area, 1st floor. 9/14/2000 7:54:50 PM
|
ELE00-03143
| Final | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | P | PART |
|
|
JOHN ###-#### FN --BACK DOOR UNLOCKED FOR ACCESS. in-house timer for fan and manual switch in-operative. called contractor. 9/14/2000 7:49:56 PM 9/14/2000 7:51:15 PM
|