BLD99-03132
| BLD-Energy code compliance | 9/13/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | CANC |
|
|
Scheduled by Inspector: 415 On 9/13/2000
wrong # 9/13/2000 11:20:12 AM
|
BLD00-01659
| BLD-Framing/Rough-in | 9/13/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | PASS |
|
|
tom ###-#### shear nail insp
passed ,, ok to side 9/14/2000 10:54:38 AM
|
BLD00-02171
| BLD-Footing | 9/13/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | FAIL |
|
|
todd-- ###-#### ft
not set up yet,, need to recall 9/14/2000 10:15:58 AM
|
BLD00-02703
| BLD-Framing/Rough-in | 9/13/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | PASS |
|
|
Rainier Const ###-####
|
BLD00-01844
| BLD-Footing | 9/13/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | FAIL |
|
|
ft insp-- donny ###-####
need soil rpt. 9/14/2000 12:30:28 PM
|
BLD00-02517
| BLD-Footing | 9/13/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | CANC |
|
|
FT INSP JAKE ###-####
j.s. to do 9/14/2000 10:14:32 AM
|
BLD00-02518
| BLD-Footing | 9/13/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | CANC |
|
|
JAKE ###-#### FT
J.S. to do 9/14/2000 10:14:56 AM
|
BLD00-01953
| BLD-Footing | 9/13/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 415 On 9/13/2000 reinspect
c/n posted,,soil eng. needed 9/14/2000 10:14:01 AM
|
BLD00-02171
| BLD-Footing | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | A | NR |
|
|
Todd ###-#### late pm
|
MEC00-03112
| Pressure Test | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | P | PASS |
|
|
joe ###-#### please call before going out gas test only ###-#### work #
held 25#s for 20 mins.,,, gas line for furnace and h2o heater 9/14/2000 4:10:58 PM
|
BLD00-02171
| BLD-Footing | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 415 On 9/14/2000 ###-#### todd
wip 9/14/2000 3:54:33 PM
|
BLD00-01844
| BLD-Footing | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | P | NR |
|
|
donny ###-####
|
BLD00-02496
| BLD-Footing | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | P | PART |
|
|
steve ###-####
appears ok,, work in progress 9/14/2000 1:38:36 PM
|
BLD00-01844
| BLD-Footing | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 415 On 9/14/2000
part on basement ftgs 9/14/2000 3:16:17 PM
|
BLD00-00347
| BLD-Final | 9/12/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | P | PASS |
|
|
phil ###-####
c of c # 19726 issued 9/14/2000 2:57:15 PM
|
BLD00-02317
| BLD-Framing/Rough-in | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | P | PART |
|
|
SHEAR NAIL INSP-- DWAYNE ###-####
ext. only ,, verify 2 hold downs retrofits in s.e. corner kitchen @ framing inspection 9/14/2000 1:14:35 PM
|
BLD00-02226
| BLD-Footing | 9/14/2000 | 9/14/2000 | 9/14/2000 12:00:00 AM | P | FAIL |
|
|
Todd ###-####
not set up,, no plans 9/14/2000 1:20:41 PM
|