Inspections for the day of: Friday, September 14, 2001.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01605 BLD-Aging Inspection9/14/20019/14/20019/14/2001 12:00:00 AM PASS
done with out inspection 9/14/2001 11:32:28 AM
BLD01-01589 BLD-Aging Inspection9/14/20019/14/20019/14/2001 12:00:00 AM PASS
done with out inspection 9/14/2001 11:43:36 AM
BLD01-02153 BLD-Footing9/13/20019/14/20019/14/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/13/2001 at 12:15:13. Contact: .
BLD01-01646 BLD-Framing/Rough-in9/13/20019/14/20019/14/2001 12:00:00 AMANR
JAMIE ###-####
BLD01-01683 BLD-Other9/13/20019/14/20019/14/2001 12:00:00 AMADONE
can you place a stop work returned check 2 times. thanks linda . Stop work notice issued home owner will get payment down town 9/14/2001 9:52:44 AM
MEC01-02734 Final9/13/20019/14/20019/14/2001 12:00:00 AMANR
frontier heating-- ###-####- f/p only
MEC01-02718 Rough-in9/13/20019/14/20019/14/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/13/2001 at 17:19:29. Contact: ###-####.
MEC01-02744 Pressure Test9/13/20019/14/20019/14/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/13/2001 at 11:41:45. Contact: ###-####.
BLD01-01679 BLD-Final9/13/20019/14/20019/14/2001 12:00:00 AMPNR
TED ###-#### needs F.L.S. sign off no inspection done 9/14/2001 1:34:55 PM
BLD01-02478 BLD-Final9/13/20019/14/20019/14/2001 12:00:00 AMPPASS
fn ron -###-####--at bench swr-
BLD01-00012 BLD-Framing/Rough-in9/14/20019/14/20019/14/2001 12:00:00 AMPPASS
###-#### grout inspection top 6 ft of west wall and west half of north wall first 4 ft of car wash walls 9/14/2001 11:08:59 AM
BLD98-02583 BLD-Framing/Rough-in9/14/20019/14/20019/14/2001 12:00:00 AMPPASS
###-#### dave first layer of sheet rock on south wall and parapet wall 9/14/2001 1:51:59 PM
MEC01-02581 Rough-in9/14/20019/14/20019/14/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/14/2001 at 11:17:58. Contact: ###-####.
MEC01-02581 Pressure Test9/14/20019/14/20019/14/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/14/2001 at 11:18:06. Contact: ###-####.
MIS01-00188 BLD-Final9/14/20019/14/20019/14/2001 12:00:00 AMPFAIL
###-#### needs landings at bottom of stairs and a driveway 9/14/2001 3:06:05 PM