Inspections for the day of: Thursday, September 14, 2006.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAimee Hughes
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC05-02059 Tracking Control8/31/20069/14/20069/14/2006 2:49:19 PMAFAIL
verbal c/n to RP to address sediment barriers needing repair and trash container needing repair.
ESC06-00088 Tracking Control8/31/20069/14/20069/14/2006 2:49:05 PMAFAIL
verbal c/n to RP to address sediment barriers needing repair and trash container needing repair.
ESC05-01856 Tracking Control8/31/20069/14/20069/14/2006 2:10:50 PMAPASS
Site looks okay.
ESC05-02061 Tracking Control8/31/20069/14/20069/14/2006 2:07:02 PMAPASS
Site looks good.
ESC06-00870 Tracking Control8/31/20069/14/20069/14/2006 2:06:28 PMAFAIL
verbal c/n to RP. ESC sign needs to be reposted and trash container is needed on site.
ESC05-01503 Tracking Control9/14/20069/14/20069/14/2006 1:05:20 PMPPASS
Site looks good. Talked to RP about making sure that all signs are posted, all trash is maintained, and all track out is maintained in subdivision.
ESC05-01500 Tracking Control9/14/20069/14/20069/14/2006 1:05:05 PMPPASS
Site looks good. Talked to RP about making sure that all signs are posted, all trash is maintained, and all track out is maintained in subdivision.
ESC06-01322 Tracking Control9/14/20069/14/20069/14/2006 1:04:51 PMPPASS
Site looks good. Talked to RP about making sure that all signs are posted, all trash is maintained, and all track out is maintained in subdivision.
ESC05-01501 Tracking Control9/14/20069/14/20069/14/2006 1:04:25 PMPPASS
Site looks good. Talked to RP about making sure that all signs are posted, all trash is maintained, and all track out is maintained in subdivision.
ESC06-01248 Tracking Control9/14/20069/14/20069/14/2006 1:04:12 PMPPASS
Site looks good. Talked to RP about making sure that all signs are posted, all trash is maintained, and all track out is maintained in subdivision.
ESC06-01350 Tracking Control9/14/20069/14/20069/14/2006 1:03:51 PMPPASS
Site looks good. Talked to RP about making sure that all signs are posted, all trash is maintained, and all track out is maintained in subdivision.
ESC06-01349 Tracking Control9/14/20069/14/20069/14/2006 1:03:30 PMPPASS
Site looks good. Talked to RP about making sure that all signs are posted, all trash is maintained, and all track out is maintained in subdivision.
ESC05-01502 Tracking Control9/14/20069/14/20069/14/2006 1:03:18 PMPPASS
Site looks good. Talked to RP about making sure that all signs are posted, all trash is maintained, and all track out is maintained in subdivision.
ESC05-01796 Tracking Control9/14/20069/14/20069/14/2006 1:01:37 PMPPASS
Site looks good. Talked to RP about making sure that all signs are posted, all trash is maintained, and all track out is maintained in subdivision.
ESC05-01797 Tracking Control9/14/20069/14/20069/14/2006 1:01:02 PMPPASS
Site looks good. Talked to RP about making sure that all signs are posted, all trash is maintained, and all track out is maintained in subdivision.
ESC05-01343 Site Final9/14/20069/14/20069/14/2006 12:55:00 PMPPASS
Final stabilization has been completed.
ESC05-00411 Site Final9/14/20069/14/20069/14/2006 12:54:07 PMPPASS
Final stabilization has been completed.
ESC05-01342 Site Final9/14/20069/14/20069/14/2006 12:12:47 PMPPASS
Final stabilization has been completed.
ESC05-00748 BMP Violation9/14/20069/14/20069/14/2006 12:12:06 PMPFAIL
c/n posted on site to address no ESC sign posted, trash container needs repaired and trash maintenance is needed. all issues must be completed by the end of the day or a stop work will be issued. Todd with Borup Construction has been notified.
ESC05-00747 BMP Violation9/14/20069/14/20069/14/2006 12:11:40 PMPFAIL
c/n posted on site to address no ESC sign posted, trash container needs repaired and trash maintenance is needed. all issues must be completed by the end of the day or a stop work will be issued. Todd with Borup Construction has been notified.
ESC05-02015 Tracking Control9/14/20069/14/20069/14/2006 11:57:59 AMPPASS
Site looks okay, talked to RP about maintaining trash on all sites in subdivision.
ESC05-02006 Tracking Control9/14/20069/14/20069/14/2006 11:56:28 AMPPASS
Site looks okay, talked to RP about maintaining trash on all sites in subdivision.
ESC05-00748 Conference9/14/20069/14/20069/14/2006 12:00:00 AMADONE
Received fax from Pat with Petra to remove Greg Hedin as the RP on this project as Petra is not involved with the construction phase. Steve Webb contacted Todd Stoddard with Borup Construction to get current RP listed on permit or a stop work may be issued.