Inspections for the day of: Friday, September 14, 2007.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00565 INSP-Alarm Testing9/14/20079/14/20079/14/2007 4:51:18 PMPFAIL
Manual pull stations are mounted too high. The fire alarm panel has not been set up to dial out correctly. The inspection was stopped.
FIR07-00756 INSP-Sprinkler Rough-in/Hydro9/14/20079/14/20079/14/2007 4:47:36 PMPFAIL
The remaining underground supply piping is not buried deep enough. Do not cover piping.
FIR06-00011 INSP-Alarm Testing9/14/20079/14/20079/14/2007 4:45:19 PMPDONE
See mike timmermans notes to see which devices have been tested.
BLD05-00633 FIRE-Final Inspection9/13/20079/14/20079/14/2007 4:43:59 PMACANC
wayne - fire life safety Phone #: ###-####
FIR06-00811 INSP-Alarm Testing9/13/20079/14/20079/14/2007 4:42:30 PMADONE
See the city approved plans for devices tested in area D.
FIR07-00626 INSP-Final Inspection9/10/20079/14/20079/14/2007 2:31:25 PMPPASS
Permit finaled
BLD06-01173 FIRE-Final Inspection9/13/20079/14/20079/14/2007 1:04:26 PMAPASS
Life safety passed.
BLD07-01704 FIRE-Conference9/13/20079/14/20079/14/2007 1:03:10 PMADONE
I discussed wall heights/sprinkler obstructions with the general contractor
FIR05-00536 INSP-Sprinkler Rough-in9/13/20079/14/20079/14/2007 1:01:36 PMAPASS
The electrical wiring has been removed from the sprinkler piping on the fourth floor.
BLD07-02292 BLD-Final9/12/20079/14/20079/14/2007 11:59:49 AMAPASS
Life safety passed.
FIR07-00534 INSP-Final Inspection9/13/20079/14/20079/14/2007 11:46:24 AMACANC
needs to be rescheduled per contractor
FIR07-00707 INSP-Sprinkler Rough-in9/14/20079/14/20079/14/2007 11:44:44 AMPPASS
Sprinkler piping is ok to cover
FIR07-00722 INSP-Sprinkler Rough-in9/13/20079/14/20079/14/2007 11:43:11 AMAPASS
Sprinkler piping is ok to cover